My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• One (1) Final Basis of Design Memo <br />TASK 13 100% PS&E SUPPORT <br />The original scope of work shown in this task requires an increased level of effort as described <br />in Task 10. The supplemented scope is shown below: <br />TASK 13.1— Story Creek <br />• Added Scope: <br />• HYDRAULICS <br />♦ Assist CONSULTANT to develop design details and special provisions. <br />• STRUCTURES <br />♦ Provide response(s) to 90% PS&E Submittal review comments. <br />♦ Provide 100% Design Plans, Special Provisions, and Engineer's Estimate of Probable <br />Construction Cost for advertisement. <br />♦ Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• ROADWAY <br />♦ Prepare complete roadway calculations in accordance with the WSDOT and/or AASHTO <br />requirements for any barrier length of need. <br />♦ Provide compiled 100% Design Plans, Special Provisions, and Engineer's Estimate of <br />Probable Construction Cost for advertisement of the culvert replacement. <br />♦ Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• DELIVERABLES <br />♦ STRUCTURES <br />• One (1) set of response(s) to 90% PS&E submittal review comments. <br />• One (1) set of 100% Design Plans (11" x17" sheets and PDF's) <br />• One (1) set of Special Provisions pertain to replacement structure and structural <br />elements. <br />• One (1) list of bid items and quantities with backup calculations. <br />• One (1) Probable Construction Cost for culvert structural elements for <br />advertisement. <br />♦ ROADWAY <br />• One (1) set of responses to 90% comments <br />• One (1) set of 100% Design Plans (11" x17" sheets and PDF's) <br />• One (1) set of Special Provisions pertaining to roadway elements <br />• One (1) list of bid items and quantities with backup calculations <br />• One (1) Probable Construction Cost for roadway elements for advertisement. <br />Scope of Service_Teanaway Hyd Imp_Amend 01_2018-04-19 <br />Page 13 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.