My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />♦ Provide responses to 60% Over -The -Shoulder review comments <br />• ROADWAY <br />♦ Prepare contract plans for the Lick Creek culvert replacement, which shall include the <br />following information: <br />• Horizontal Alignment <br />• Vertical Alignment <br />• Typical Sections <br />• Site Prep Plan(s) <br />• Paving Plan(s) <br />• Traffic Barrier(s) <br />• MOT Plan(s) <br />• Detail(s) <br />♦ Coordination with COUNTY and CONSULTANT team. <br />♦ Develop Special Provisions for construction, except for structure elements. <br />♦ Produce a compiled set of plans, Special Provisions, and cost estimate from all <br />disciplines. <br />♦ Develop 90% cost estimate. <br />♦ Provide responses to 60% Over -The -Shoulder review comments. <br />♦ Update the Preliminary Basis of Design document for any outstanding issue resolution, <br />project change(s), new/changed design decisions, etc. This document will be <br />considered the Final Basis of Design. <br />♦ Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• DELIVERABLES <br />♦ ENVIRONMENTAL <br />• One (1) set of responses to 60% Over -The -Shoulder Review comments. <br />• 90% Plans (in PDF or CAD) <br />♦ STRUCTURES <br />• One (1) set of responses to 60% Over -The -Shoulder Review comments <br />• 90% Plans (in PDF or CAD) <br />• Special provisions for structure elements <br />• 90% Estimate of Cost <br />♦ ROADWAY <br />• Response to 60% Over -The -Shoulder Review comments. <br />• 90% Design Plans (PDF and CAD files) <br />• Special Provisions for roadway elements <br />• Compiled 90% PS&E set <br />• 90% Cost Estimate <br />Scope of Service_Teanaway Hyd Imp_Amend 01_2018-04-19 <br />Page 12 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.