My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DELIVERABLES <br />♦ ENVIRONMENTAL <br />• 30% mitigation/restoration plan sheets <br />♦ HYDRAULICS <br />• Creek cross-section and horizontal alignment <br />♦ STRUCTURE <br />• One (1) Preliminary Evaluation of a premanufactured culvert <br />• Preliminary Culvert Plans (Plan & Elevation and Typical Section) of a <br />premanufactured culvert. <br />♦ ROADWAY <br />• One (1) Draft Basis of Design Memo <br />• One (1) 30% plan set <br />TASK 1160% OVER -THE -SHOULDER REVIEW MEETING <br />The original scope of work shown in this task requires an increased level of effort as described <br />in Task 10. The added or deleted scope is shown below: <br />• Added Scope: <br />This task includes attendance of select members of the delivery team at one (1) over - <br />the -shoulder meeting to review and document comments on current progress to an <br />approximate 60% level. <br />• ENVIRONMENTAL <br />♦ Create 30-60% mitigation/restoration plan set using a landscape architect stamped <br />channel grading, habitat features, and revegetation plan sheets. <br />• STRUCTURES <br />♦ Attend one (1) review meeting with COUNTY, CONSULTANT, and STAKEHOLDER staff <br />via conference call. <br />♦ Provide culvert reference materials as requested by the County, the manufacturer, or <br />design team to facilitate 60% over -the -shoulder meeting <br />• ROADWAY <br />♦ Attend one (1) review meeting with COUNTY, CONSULTANT, and STAKEHOLDER staff <br />♦ Produce one (1) progress set of plans that includes both the Lick Creek and Story Creek <br />project sites. <br />♦ Develop one (1) 60% cost estimate that includes both the Lick Creek and Story Creek <br />project sites <br />♦ Develop one (1) preliminary list of special provisions that includes both the Lick Creek <br />and Story Creek project sites. <br />• DELIVERABLES <br />♦ Comment Log of all comments provided at 60% Over -The -Shoulder review meeting. <br />Scope of Sewice_Teanaway Hyd Imp Amend 01_2018-04-19 <br />Page 9 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.