My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ One (1) 60% Progress set of plans, specifications, and estimate for the Story Creek site. <br />♦ One (1) 60% Progress set of plans, specifications, and estimate for the Lick Creek site <br />• Deleted Scope: <br />• DELIVERABLES <br />♦ Comment Log of hydraulic comments provided at 60% Over -The -Shoulder review <br />meeting. <br />TASK 12 90% DESIGN SUPPORT <br />The original scope of work shown in this task requires an increased level of effort as described <br />in Task 10. The supplemented scope is shown below: <br />TASK 12.1— Story Creek <br />• Added Scope: <br />• HYDRAULICS <br />♦ Assist CONSULTANT team to develop design details and special provisions. <br />• STRUCTURES <br />♦ The CONSULTANT shall prepare contract plans for the Story Creek Culvert <br />Replacement, which are expected to be: <br />• General notes on design, construction and materials <br />• Culvert layouts, elevations, and typical section(s) <br />♦ Develop Special Provisions for culvert construction <br />♦ Develop 90% cost estimate for culvert elements that are not the responsibility of the <br />manufacturer. <br />♦ Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />♦ Provide responses to 60% Over -The -Shoulder review comments <br />• ROADWAY <br />♦ Prepare contract plans for the Story Creek culvert replacement, which shall include the <br />following information: <br />• Horizontal Alignment <br />• Vertical Alignment <br />• Typical Sections <br />• Site Prep Plan(s) <br />• Paving Plan(s) <br />• Traffic Barrier(s) <br />• MOT Plan(s) <br />• Detail(s) <br />♦ Coordination with COUNTY and CONSULTANT team. <br />♦ Develop Special Provisions for roadway construction. <br />Scope of Service_Teaneway Hyd Imp_Amend 01_2018-04-19 <br />Page 10 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.