My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ Coordination with COUNTY staff and CONSULTANT team. <br />Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• DELIVERABLES <br />♦ STRUCTURES <br />One (1) Preliminary Evaluation of a four-sided precast concrete box culvert <br />• Preliminary culvert plans (plan, elevation, & typical section) of four-sided <br />precast concrete box culvert. <br />♦ ROADWAY <br />One (1) Draft Basis of Design Memo <br />One (1) 30% plan set. <br />TASK 10.2 — Lick Creek <br />• Added Scope: <br />• ENVIRONMENTAL <br />♦ Create 0-30% mitigation/restoration plan set using a landscape architect stamped <br />channel grading, habitat features, and revegetation plan sheets. <br />• HYDRAULICS <br />♦ Develop the creek typical section and horizontal alignment <br />STRUCTURES <br />♦ Evaluate Preliminary Concepts of a premanufactured culvert directly with the COUNTY. <br />As a result of this Preliminary Evaluation, the manufactured culvert will be evaluated <br />with regard to the proposed length, width, orientation, and cost as pertains to: <br />• Site hydraulics and scour conditions <br />• Site preliminary geotechnical information <br />• ROADWAY <br />♦ Develop a preliminary Basis of Design Memo including project criteria, existing and <br />proposed geometrics, project constraints, design speed, clear zone, design elements, <br />design variances, design decisions, environmental permits, right-of-way, hydraulics, <br />maintenance of traffic (MOT), maintenance concerns, and any outstanding issues to be <br />resolved. Some of these elements may not be applicable for this project. <br />♦ Layout and evaluate up to three (3) horizontal and vertical MOT alignments to <br />accommodate the proposed culvert replacement. <br />♦ Develop the overall model of the project site including the proposed creek corridor. <br />♦ Develop 30% plan set with existing and proposed horizontal and vertical alignments for <br />roadway centerline and preferred MOT centerline, and right-of-way impacts (if any). <br />♦ Coordination with COUNTY staff and CONSULTANT team. <br />♦ Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />Scope of Sewice_Teanaway Hyd Imp_Amend 01_2018-0419 <br />Page 8 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.