My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including photographs taken during the site reconnaissance, text, tables, and figures <br />that describe the results of the hydrologic, geomorphic, hydraulic, and scour analyses. <br />If deemed necessary, a description of scour countermeasure recommendations will be <br />provided. The report will include key hydraulic data needed for permit application. A <br />draft version of the Final Basis of Design Report will be provided for review and one (1) <br />set of comments. <br />• 30%,60%,90%& 100% Design <br />♦ Assist team to develop design details and special provisions. <br />• DELIVERABLES <br />♦ One (1) Preliminary Basis of Design <br />♦ One (1) Final Basis of Design <br />TASK 7.2 — Lick Creek <br />1. Geomorphic Reach Assessment <br />1.1. Conduct a rapid geomorphic assessment on the Teanaway River using available aerials, <br />existing reports and cross sections provided by the County. The cross sections will be <br />used to conduct a normal depth calculation to obtain hydraulic parameters necessary <br />to conduct a sediment transport relation to determine if the addition of flows from Lick <br />Creek have a significant effect on sediment transport in the Teanaway River. <br />2. Bank Stability Assessment and Design <br />2.1. Bank and channel stability through the re -aligned segment of Lick Creek will be <br />conducted using the geotechnical information provided by the CONSULTANT team. <br />Deleted Scone: <br />• Hydrology <br />♦ Hydrology for Lick Creek will be determined by reviewing: <br />Scour Analysis <br />Depth of scour estimates will be computed at up to two (2) residential/private property <br />water crossings. These estimates will be provided for consideration in design of the <br />proposed water crossing structures. <br />TASK 8 RIGHT-OF-WAY EASEMENT/ACQUISITION <br />The original scope of work shown in this task requires a decreased level of effort for the Lick <br />Creek site. The original scope was to secure four separate Temporary Construction Easements <br />from private parcels. The new scope directed by the COUNTY is to support the COUNTY in <br />obtaining agreement with Department of Natural Resources to construct a new creek channel <br />on their one parcel. The new or deleted scope is shown below: <br />• Added Scone: <br />• Lick Creek: <br />♦ Prepare a Site Inspection Report (up to one parcel). <br />Scope of Service—Teanaway Hyd Imp Amend 012018-04-19 <br />Page 5 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.