Laserfiche WebLink
<br /> 31 <br /> <br />34.2 Current quarry work will impact air quality. Quarry operations will be amended as the <br />development moves north. Quarry operations will continue and provide resource materials <br />needed for the development. Once residential vertical build out is within 250’ if quarry <br />operations, operations will cease and reclamation will commence. <br /> <br />35) Hazardous Materials <br /> <br />Mitigation measures related to hazardous materials are discussed on pg. 3-238 of the FEIS. <br /> <br />35.1 A control and response plan shall be developed to deal with hazardous material related to <br />construction. <br /> <br />35.2 Convenient means of safe disposal of any household hazardous materials shall be provided. <br /> <br />36) Historic, Cultural, and Archeological Resources <br /> <br />Mitigation measures related to Historic and Cultural Preservation are discussed on pg. 3 -241 of the <br />FEIS. <br /> <br />36.1 The applicant shall formulate a plan for limited subs urface testing in any areas of high <br />probability for containing pre contact and historic resources. <br /> <br />36.2 The applicant shall prepare an inadvertent discovery plan which states applicable state laws and <br />proper procedures that is to be followed if archaeological resources are identified. A contact list <br />of appropriate parties shall be included. <br /> <br />36.3 Should ground disturbing or other activities related to the proposed plat result in the inadvertent <br />discovery of cultural or archaeological materials, work shall be stopped in the immediate area <br />and contact be made with the Washington State Department of Archeology and Historic <br />Preservation. Work shall remain suspended until the find is assessed and appropriate <br />consultation is conducted. Should human remains be inadvertently discovered, as dictated by <br />Washington State RCW 27.44.055, work shall be immediately halted in the area and contact <br />made with the coroner or local law enforcement the most expeditious manner possible. <br /> <br />37) Geology, Topology, and Soils <br /> <br />The FEIS examines impacts related to geologic hazards, and proposes mitigation measures (3 -265). <br /> <br />37.1 Development on the steep, eastern portion of the site shall require geotechnical analysis prior to, <br />and during construction. <br /> <br />37.2 The alluvial fan area in the northwest corner of the project will be private property with <br />restrictions on for the removal of foliage or land clearing, along with the alluvial fan located in <br />the southern portion of the property. <br /> <br />37.3 After decommissioning, the rock quarry area shall be reclaimed and repurposed into the 100,000 <br />gallon water storage facility required under Water District Resolution 30906.2.