My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Revised Ordinance with Map 4-10-18 Track Changes
>
Meetings
>
2018
>
04. April
>
2018-04-17 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Revised Ordinance with Map 4-10-18 Track Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 1:47:01 PM
Creation date
4/12/2018 1:45:09 PM
Metadata
Fields
Template:
Meeting
Date
4/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Request to Approve an Ordinance Granting Approval to Marian Meadows Planned Unit Development (PD-17-00001), Conditional Use Permit (CU-17-00001), and Plat (LP-17-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
44013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 30 <br />“The Bonneville Power Administration imposed certain conditions on the portions of <br />these lots encumbered by its high voltage transmission line right-of-way. BPA does not <br />allow structures to be built within the right-of-way, nor does it allow access to be <br />blocked to any transmission facilities. Any activity that is to occur within the right-of <br />wa y may be addressed to BPA real Estate Field Services at (877) 417-9454”. <br /> <br />31.3.2 BPA shall be allowed the opportunity to review the location of proposed roads, use of <br />existing access roads, snow storage, utilities, etc. to ascertain whether or not the uses <br />can be permitted. The owner shall submit a land use application, the associated $250 <br />application fee, and acquire a Land Use Agreement from BPA in addition to the <br />County’s building permit for any portion of the owner’s development plans that lie <br />within BPA’s right-of-way. <br /> <br />31.4 Water <br /> <br />31.4.1 Marian Meadows/Easton Water District shall confirm an intended connection to the <br />Easton Water District, and then submit estimated water usage quantities, so that DOH <br />can determine whether the precise number of new connections that are proposed for <br />Marian Meadows can be served by the existing system, or apply for a new Group A <br />Community public water system with the DOH Office of Drinking Water. <br /> <br />31.4.2 Marian Meadows shall identify how wastewater will be managed. <br /> <br />31.4.3 The Applicant shall submit documentation and engineering design for proposed water <br />extension to DOH for the review and approval. <br /> <br />32) Visual Quality, Light and Glare <br /> <br />As described in the FEIS, visual impacts can be mitigated through the following methods, and such <br />methods are conditions of approval: <br /> <br />32.1 Road cuts shall be revegetated with native coniferous trees. <br /> <br />32.2 Outdoor lighting shall be shielded and directed downward. <br /> <br />33) Noise <br /> <br />Noise impacts are discussed on pg. 3-227 of the FEIS. <br /> <br />33.1 When possible, construction activities shall be limited to daylight hours. <br /> <br />33.2 KCC 9.45.040 exempts construction from noise ordinances between the hours of 6:00 am and <br />10:00 pm. Should circumstances require work outside of these hours, the applicant shall apply <br />for a variance with the Board of County Commissioners pursuant to KCC 9.45.070. <br /> <br />34) Air Quality <br /> <br />34.1 The project shall comply with all applicable local, state and federal laws regulating air quality.
The URL can be used to link to this page
Your browser does not support the video tag.