Laserfiche WebLink
11.6.2 County Analysis <br />No further analysis is required in regard to these requirements. <br />11.7 Kittitas Coun Fire District # 3 <br />11.7.1 In a comment letter dated July 17th, 2017, The Kittitas County Fire District <br />93 listed several concerns. These concerns include updrafts on slopes, and <br />excessive density allowing wildfires to spread, and congestion associated <br />with a single access which may prevent firefighter access to the <br />development. The Fire District also states that construction of the town <br />houses may necessitate a ladder engine the District currently does not <br />possess, along with the infrastructure to store it. <br />11.7.2 County Analysis <br />Mitigation measures are listed in the FEIS. They include: <br />11.7.2.1 Avoid residential lots in the steep forested portion of the site. <br />11.7.2.2 Provide secondary access via bridge over Yakima River or from <br />the north and connecting to Silver Creek Road. <br />11-7.2.3 Maintain road grades no greater than 10%. <br />11.7.2.4 ,Support a single station to co -locate facilities by providing a site <br />and contribute proportional share to fund a new fire truck. <br />11.7.2.5 Built in fire suppression. <br />11.7.2.6 Require non-combustible areas immediately adjacent to buildings, <br />and reduce and irrigate vegetation in the 30- to 50 -foot <br />circumference of buildings. <br />11.7.2.7 Public fire safety education. <br />11.7.2.8 Hospital District: A combination of regular levies and capital <br />facility levies would be required; project contribution to a share of <br />equipment costs would be required. <br />11.7.2.8 Fire District: Additional equipment would likely require voter <br />approved Ievies. <br />11.7.3 The project shall comply with KCC Title 12 Roads and Bridges, Title 13 <br />Water and Sewers, 13.35.020 Water Availability, and Title 20 Fire and Life <br />Safety. <br />11.8 Bonneville Power Administration (BPA) <br />11.8.1 The Bonneville Power Administration provided a comment letter dated July <br />5, 2017. In the letter, BPA expressed the following concerns related to <br />PD -17-00001, CU -17-00001, LP -17-00001 <br />Marian Meadows Project <br />Page 9 of 27 <br />