My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development in and near its right of way. <br />11.8.2 County Analysis <br />To mitigate these impacts, the following conditions are required: <br />11.8.2.1 The plat map shall include the following note: <br />"The Bonneville Power Administration imposed certain conditions <br />on the portions of these lots encumbered by its high voltage <br />transmission line right-of-way. BPA does not allow structures to be <br />built within the right-of-way, nor does it allow access to be <br />blocked to any transmission facilities. Any activity that is to occur <br />within the right -of way may be addressed to BPA real Estate Field <br />Services at (877) -417-9454". <br />11.8.2.2 BPA shall be allowed the opportunity to review the location of <br />proposed roads, use of existing access roads, snow storage, <br />utilities, etc. to ascertain whether or not the uses can be permitted. <br />11.8.2.3 The owner shall submit a land use application, the associated $250 <br />application fee, and acquire a Land Use Agreement from BPA in <br />addition to the County's building permit for any portion of the <br />owner's development plans that lie within BPA's right-of-way. <br />11.9 Kittitas County Building Official <br />11.9.1 The Kittitas County Building Department commented on the proposal on <br />June 23`d, 2017, stating that "All construction of buildings shall conform to <br />most current adopted edition of the IBC, IFC, IRC and Washington State <br />Amendments as well as any other building codes adopted by Washington <br />State at the time of building permit submittal." <br />11.9.2 County Analysis <br />Compliance with these codes will be required at the time of building permit <br />submittal. No further analysis is required for these recommendations. <br />11.10 Public Comments <br />Public comments are shown in Exhibit # 65. Comments received included the <br />following concerns: <br />1 I.10.1 Rural Density and Character <br />Several comments raised concerns over the density of the proposed <br />development and maintenance of rural character. Density and rural character <br />related issues are examined in Sections VI and VII. <br />11.10.2 Police Service <br />Mitigation for impacts to police services is discussed in the FEIS (pg. 3-158). <br />Fair share contributions can be made from the project to provide resources <br />PD -17-00001, CU -17-00001, LP -17-00001 <br />Marian Meadows Project <br />Page 10 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.