My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
>
Meetings
>
2016
>
06. June
>
2016-06-07 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:19 AM
Creation date
4/7/2018 10:59:31 AM
Metadata
Fields
Template:
Meeting
Date
6/7/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing Continued from May 17, 2016 to Consider a Proposal to Create a Development Agreement to Allow the Approved Palomino Fields Subdivision to be Completed in Phases. The Record is Closed.
Order
2
Placement
2:00pm Public Hearing
Row ID
29903
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. iAen the effluent volume reaches a monthly average of'8,000 gallons per day the <br />applicant hill be required to start the planning process for this.facilio). No additional <br />building permits will be issued until the K'ashington State Department of Health or the <br />Washington State Department of Ecology has confirmed that the planning process, for the <br />facility has started. <br />b. When the effluent volume reaches a monthly average of 10, 000 gallons per day the <br />applicant will be required to have completed the planning process_for the facility. In <br />addition the applicant hill be required to start creating engineering and construction <br />drawings for the_facility. No additional building permits will be issued until the <br />Washington State Department of Health or the Washington State Department of Ecology <br />has confirmed that the planning process for the facility has been completed and that the <br />applicant has started the engineering and construction drawings. <br />c. iiq7e77 the effluent volume reaches a monthly average gf'12,000 gallons per day the <br />applicant will be required to have completed the engineering and construction plans for <br />this facility. No additional building permits will be issued until the Washington State <br />Department of Health or the Washington State Department of Ecology has confirmed that <br />the engineering and construction plans for the facility have been completed. <br />d. When the effluent volume reaches a monthly average of 14, 000 gallons per day the <br />applicant will be required to have obtained a building permit for the facility and to have <br />started the construction of the, facility. No additional building permits will be issued until <br />the Kittitas County Building Department has confirmed that a building pernzit.for the <br />facility has been issued and that construction has started. <br />e. When the effluent volume reaches a monthly average of 15, 000 gallons per day the <br />applicant will be required to have completed and have an operational reclaimed facility. <br />No additional building permits will be issued until the Washington State Department of <br />Health or the Washington State Department o_f Ecology has confirined that the facility is <br />operational, <br />f. The applicant ivill record and provide to Cornrni.inity Development Ser-1,ices the recorded meter <br />readings.1br each Conninunity Septic System or Large On Site Septic Systemn oii a quarterly basis. <br />G. If the applicant wishes to access city systems in the future, it will be recommended that all <br />improvements be developed to current city standards. <br />H. Metering shall be required on all residential well connections and metering results shall be recorded <br />in a manner consistent with Kittitas County and Washington State Department of Ecology <br />requirements (Memorandum of Agreement between Kittitas County and Washington State). <br />I. The approval of this division of land includes no guarantee that there is a legal right to withdraw <br />groundwater within the land division. The approval of this division of land provides no guarantee <br />that use of water under the ground water exemption (RCW 90.44.050) for this plat or any portion <br />thereof will not be subject to curtailment by the Department of Ecology or a court of law. <br />J. Washington Administrative Code (WAC) 173-150 provides for the protection of existing rights <br />against impairment, i.e. interruption or interference in the availability of water. If the water supply in <br />your area becomes limited your use could be curtailed by those with senior water rights. <br />V. Historic and Cultural Preservation <br />A. Prior to any ground breaking activity on the subject property, the applicant shall consult with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.