My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
>
Meetings
>
2016
>
06. June
>
2016-06-07 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:19 AM
Creation date
4/7/2018 10:59:31 AM
Metadata
Fields
Template:
Meeting
Date
6/7/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing Continued from May 17, 2016 to Consider a Proposal to Create a Development Agreement to Allow the Approved Palomino Fields Subdivision to be Completed in Phases. The Record is Closed.
Order
2
Placement
2:00pm Public Hearing
Row ID
29903
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yakama Nation regarding an archaeological survey of the subject property due to a high potential for <br />cultural resource sites at the proposed subdivision. Documentation shall be submitted to Community <br />Development Services to be maintained in the project file. <br />VI. Light and Aesthetics <br />A. All outdoor lighting shall be shielded and directed downward to minimize the effect to nearby <br />residential properties. <br />VII. Noise <br />A. Construction activities shall comply with KCC 9.45 (Noise). Construction hours shall be from <br />7:OOam to 7:OOpm. <br />VIII. Land and Shoreline Use <br />A. Wetland and Wildlife study will be required, prior to final approval, establishing the appropriate <br />buffers regarding sensitive areas as determined by the consultant. <br />B. One hundred foot buffers will be established along Currier Creek and shown on the final mylars. <br />C. A riparian management plan that would incorporate signage for Currier Creek will be completed prior <br />to final approval. <br />D. All waterways/waters/ditches located on the subject property, regardless of their designation of <br />intermittent, perennial or ephemeral, shall be delineated and shown on the final mylars. <br />Improvements to such water features shall not impact on-site and off-site use. <br />E. A Hydraulic Project Approval (HPA) from the Department of Fish & Wildlife shall be required for all <br />work affecting watercourses, including those that do not flow year-round. This includes, but is not <br />limited to, work associated with construction of bridges, culverts, drainage facilities, outfalls and <br />other construction affecting the bed, bank or flow of watercourses. <br />F. The applicant shall consult with the Department of Fish & Wildlife to determine the appropriate size <br />of culvert needed for the crossing of any stream or watercourse on the subject property. Prior to final <br />approval the applicant will provide documentation that said crossings meet the proposed standards. <br />IX. Public Safety <br />A. The applicant shall consult with the local school district and provide for and depict on the final mylars <br />a safe location for a bus stop. <br />B. Any future development shall comply with the International Fire Code (IFC) and its Appendices and <br />Referenced Standards, Kittitas County Code, and Kittitas County Road Standards and shall adhere to <br />the strictest of said standards. <br />x. Parks and Recreation <br />A. The proposal will include 4-5 pocket parks spaced throughout the platted development. The <br />pocket parks shall be dedicated as open space for perpetuity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.