My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
>
Meetings
>
2016
>
06. June
>
2016-06-07 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields PFDAgreement FNL with A-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:19 AM
Creation date
4/7/2018 10:59:31 AM
Metadata
Fields
Template:
Meeting
Date
6/7/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing Continued from May 17, 2016 to Consider a Proposal to Create a Development Agreement to Allow the Approved Palomino Fields Subdivision to be Completed in Phases. The Record is Closed.
Order
2
Placement
2:00pm Public Hearing
Row ID
29903
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. Air <br />c. The applicant will guarantee a thru route from Reecer Creek Road to Faust Road, to be built <br />with future development. <br />d. A temporary access at Bender Road will be built, gated and for emergency use only. <br />A. If the applicant plans to burn trees or debris from the property, the applicant shall obtain a burn permit <br />from the Department of Ecology. Only natural unprocessed vegetation may be burned in an outdoor <br />fire. It is the applicant's responsibility to contact the Department of Ecology regarding this permit. <br />III. Water & Septic <br />A. Activities such as road widening, stump pulling and clearing, grading and fill work and utility <br />placements may require an NPDES Construction Stormwater Permit issued by the Department of <br />Ecology prior to start of construction. This permit requires the preparation of a Stormwater Pollution <br />Prevention Plan. It is the applicant's responsibility to contact the Department of Ecology regarding <br />this requirement. <br />B. Prior to any grading, clearing or construction, erosion control measures shall be in place and shall be <br />able to prevent soil from being carried into surface water (this includes storm drains) by stoimwater <br />runoff. The erosion control sediment plan shall be a part of the Stormwater Prevention Plan, as <br />referenced in item A. <br />C. The applicant will develop a Group A Water System for the project. The Group A Water System shall <br />be designed by a licensed engineer and approved by the Washington State Department of Health. The <br />Group A water system shall be approved prior to final plat approval. The Group A water system <br />may be built in phases as provided for in the approved Group A Comprehensive Water System Plan <br />as required by DOH, pursuant to WAC 246. Demonstration of adequate water rights in relation to <br />development of a Group A Water System shall be completed prior to final approval. Except for the <br />existing exempt well that currently serves the property no other exempt wells shall be developed to <br />service the project. Any deviations to the water system requirements shall undergo further <br />environmental and plat review. <br />D. The applicant will provide sewage treatment through metered Community Septic Systems or metered <br />Large On -Site Septic Systems pursuant to WAC 246-272B "Large -On -Site Septic System <br />Regulations". The type of meters used will be prescribed by Kittitas County. The initial phases of the <br />project will be served by Community Septic Systems or Large On -Site Septic Systems designed by a <br />licensed septic designer and approved by the Kittitas County Environmental Health Department, <br />pursuant to KCC 13 or by the Washington State Department of Health pursuant to WAC 246. These <br />Community Septic Systems or Large On -Site Septic Systems shall be located on an adjacent parcel of <br />land, for a seamless transition into a possible Class A Reclaimed Water System Facility. <br />E. . Prior to final approval, identification of community septic areas along with completed site <br />evaluations will be required by the Kittitas County Environmental Health Department <br />E. If a Large On -Site Septic System (LOSS) system is pursued, the appropriate approval documents <br />from the Washington State Department of Health will be required prior to final approval by the <br />Kittitas County Environmental Health Department. <br />F. Class A Reclaimed Water Facility: Pursuant to WAC 173-240-050 & RCW 90.46, a Class A <br />Reclaimed Water Facility may be developed and approved by the Washington State Deptartment of <br />Health and Washington State Department of Ecology. The system, located on an adjacent parcel of <br />land, will contain the following trigger points: <br />
The URL can be used to link to this page
Your browser does not support the video tag.