Laserfiche WebLink
PART "B": Riparian Restoration <br />This residential development project could contain riparian restoration components as the <br />phasing continues pursuant to the development build out. Currently the first proposed bridge <br />(over EWC canal) to be installed contains an encroachment into an Identified Category IV <br />wetland. The square footage of this encroachment will be calculated with the appropriate <br />replacement ratio used per the Kittitas County Critical Areas Code (KCC) 17.A.04, with the <br />replacement area along Currier Creek identified. Riparian re -vegetation actions along Currier <br />Creels will require an irrigation system to establish plants in the near-term. <br />The bridge encroaches into an identified Category IV wetland on the eastern side of EWC <br />canal. The bridge abutment, on the south side of the road, encroaches into the Category IV <br />wetland 800 square feet. The 800 square feet includes an additional 15 -foot buffer from the <br />boundary edge of the wetland. Pursuant to KCC 17A.04.040 up to 2 acres of Class IV <br />wetlands may be filled, drained, or modified with no approval from the planning manager. <br />Furthermore KCC 17A.04.050 still requires a replacement ratio for disturbed wetlands. The <br />landowner will be disturbing 800 Sq. ft. of a Category IV wetland due to a single bridge <br />abutment. The landowner is proposing a replacement area along Currier Creek. The <br />replacement ratio of 2:1 will be used and is more than the county code requires for a Category <br />IV wetland. This will result in a1600 square feet replacement area along Currier Creek. <br />Native riparian plants will be used. See Exhibit C. Bridge drawing and restoration location. <br />The re -vegetation will be of like kind native riparian vegetation. <br />PART "C": Establish a 200 -foot buffer zone along Currier Creek. Develop an assessment <br />of habitat improvement opportunities and non -diversionary irrigation water efficiencies. <br />This project component will require a 100 -foot buffer from the top bank line of Currier Creek <br />on both sides (See Exhibit D). As part of this plan the landowner will include the development <br />of a piping strategy that will allow irrigation water (Ellensburg Water Company) to be <br />delivered in an efficient system of pipes rather than through the creeks. This piping strategy <br />will require a irrigation plan, using the landowners water rights, showing how irrigation water <br />will be provided to each lot has the development continues to build out. This strategy <br />eventually eliminates the use of flood irrigation and creating more efficient irrigation system <br />therefore providing more water and protection to the Currier Creek. <br />PART "D": Future habitat improvements and\or irrigation efficiencies. <br />The Landowner is willing to continue to review Currier Creek riparian areas throughout the <br />life of the project along with entertaining other agency proposals for future habitat or irrigation <br />improvements that would be beneficial to Currier Creek. The landowner will also allow the <br />continuation of access through the property for the transplanting of fish into the Currier Creek <br />tributary. <br />Page 2 of 4 <br />