My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART "B": Riparian Restoration <br />This residential development project could contain riparian restoration components as the <br />phasing continues pursuant to the development build out. Currently the first proposed bridge <br />(over EWC canal) to be installed contains an encroachment into an Identified Category IV <br />wetland. The square footage of this encroachment will be calculated with the appropriate <br />replacement ratio used per the Kittitas County Critical Areas Code (KCC) 17.A.04, with the <br />replacement area along Currier Creek identified. Riparian re -vegetation actions along Currier <br />Creels will require an irrigation system to establish plants in the near-term. <br />The bridge encroaches into an identified Category IV wetland on the eastern side of EWC <br />canal. The bridge abutment, on the south side of the road, encroaches into the Category IV <br />wetland 800 square feet. The 800 square feet includes an additional 15 -foot buffer from the <br />boundary edge of the wetland. Pursuant to KCC 17A.04.040 up to 2 acres of Class IV <br />wetlands may be filled, drained, or modified with no approval from the planning manager. <br />Furthermore KCC 17A.04.050 still requires a replacement ratio for disturbed wetlands. The <br />landowner will be disturbing 800 Sq. ft. of a Category IV wetland due to a single bridge <br />abutment. The landowner is proposing a replacement area along Currier Creek. The <br />replacement ratio of 2:1 will be used and is more than the county code requires for a Category <br />IV wetland. This will result in a1600 square feet replacement area along Currier Creek. <br />Native riparian plants will be used. See Exhibit C. Bridge drawing and restoration location. <br />The re -vegetation will be of like kind native riparian vegetation. <br />PART "C": Establish a 200 -foot buffer zone along Currier Creek. Develop an assessment <br />of habitat improvement opportunities and non -diversionary irrigation water efficiencies. <br />This project component will require a 100 -foot buffer from the top bank line of Currier Creek <br />on both sides (See Exhibit D). As part of this plan the landowner will include the development <br />of a piping strategy that will allow irrigation water (Ellensburg Water Company) to be <br />delivered in an efficient system of pipes rather than through the creeks. This piping strategy <br />will require a irrigation plan, using the landowners water rights, showing how irrigation water <br />will be provided to each lot has the development continues to build out. This strategy <br />eventually eliminates the use of flood irrigation and creating more efficient irrigation system <br />therefore providing more water and protection to the Currier Creek. <br />PART "D": Future habitat improvements and\or irrigation efficiencies. <br />The Landowner is willing to continue to review Currier Creek riparian areas throughout the <br />life of the project along with entertaining other agency proposals for future habitat or irrigation <br />improvements that would be beneficial to Currier Creek. The landowner will also allow the <br />continuation of access through the property for the transplanting of fish into the Currier Creek <br />tributary. <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.