My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Features: <br />Proposed key actions in the multi phased plan include: <br />• Remove four (4) passage barriers in Currier Creek. Remove outdated instream <br />agricultural features that currently create anadromous fish passage barriers. <br />• Currier Creek riparian corridor re -vegetation, including a possible grow -in irrigation <br />system <br />• Protective easement over 100 foot Currier Creek riparian reserve <br />• Implement habitat improvements due to development progress. <br />• Pipe conveyance of Town Canal water to meet on-going irrigated agriculture demand <br />• New irrigation strategy supplying irrigation water to the proposed residential <br />development. <br />• Continue Implementing a shared vision with Agencies to see Salmon and Steelhead re- <br />occupy the Currier Creek watershed. <br />Project Schedule: <br />Develop barrier removal engineering plans. Completed in 2007/2008. <br />Habitat restoration due to development improvements. Spring 2016. <br />Establishment of the Currier Creek Buffer. 2016 through 2020. <br />Currier Creek access for transplanting fish into this tributary. Annually with Agency timing. <br />SUPPORTING: <br />This plan expands upon a previously funded riparian project on land that this landowner <br />owned involving the Swauk Creek system. This plan is not has detailed as the Swuak <br />Restoration Plan, but assimilates to the Currier Creek riparian characteristics. By already <br />completing Part A this plan has began the implementation phase and will continue to do so as <br />the Palomino Fields development continues. <br />Agricultural and open space lands at the project site, are expected and starting to be converted <br />to more intensive land uses. The landowner envisions keeping Currier Creek in tact and if <br />needed restoring the natural habitat functions of Currier Creek as part of the conversion to <br />rural residential development. <br />Water conveyance infrastructure improvements will bring efficiencies to the irrigated <br />agriculture component of land uses at the project site. The creek will no longer be used as a <br />conveyance channel for Ellensburg Water Company water, due to the new siphon, because the <br />piped water will serve the entire agricultural demand. <br />Enhanced instream flows, coupled with strategic habitat improvement actions, will <br />significantly improve and restore natural riparian processes in the Currier Creek watershed. <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.