My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PALOMINO/CURRIER CREEK <br />RIPARIAN MANAGEMENT PLAN <br />Location(s): Township 18N, Range 18 E Sections 27 <br />WRIA: 39, Upper Yakima River <br />Drainage: Currier Creek, tributary to the Yakima River <br />PLAN DESCRIPTION: <br />Currier Creek and Ellensburg Water Company's Town Canal are appurtenant to a large acreage <br />parcel near Ellensburg (Palomino Fields) that will systematically be converted from <br />predominantly agricultural use to mixed-use rural residential and riparian reserve. <br />The landowner is now in the beginning stages of the Palomino Fields Development and with this <br />riparian plan envisions re -occupation of Currier Creek by Salmon and Steelhead at the project site. <br />This plan addresses the early phases and completions of a multi-component project that will <br />continue to improve Currier Creek. It is also possible that the landowner may obtain additional <br />funding for these continued improvements to Currier Creek. <br />Four (4) fish passage barriers will be removed from Currier Creek. Currently the Currier Creek <br />fish barriers have already been removed on Currier Creek within this development project. This <br />portion of the plan occurred in 2007/2008. <br />Irrigation water will be conveyed by piping from the Ellensburg Water Company (EWC) canal, <br />resulting in enhanced instream flows for restored riparian areas. The exact alignment of the piping <br />system will be addressed during the landowner's site planning for irrigation needs and <br />development. <br />Riparian habitat restoration along Currier Creek will be integrated as part of the transition from <br />irrigated agriculture to mixed use rural residential. A 100 -foot protected Currier Creek riparian <br />corridor will be re -vegetated with native plantings and irrigated during grow -in period. The <br />landowner's water rights from EWC Canal will be used for grow -in irrigation purposes. <br />The plan has been divided into four components, PARTS A, B, C, and D: <br />PART "A": Remove fish passage barriers in Currier Creek. <br />This project has been completed in 2007/2008. Four (4) outdated agricultural instream <br />features that currently create full, or partial, fish passage barriers in Currier Creek have been <br />removed. Removing the barriers identified on Currier Creels (see Exhibit B. "C" circles on <br />Project Area map/permits) opened up 1.40 miles of rearing habitat for Mid -Columbia <br />Steelhead, Spring Chinook, and Coho. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.