My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
attached Map as S3P1 through S3P4. Infrastructure construction for Phase S3P1 <br />and S3P2 may be constructed and receive final plat approval, including a <br />crossing of Currier Creek, at any time during the development of the Palomino <br />Fields plat as it provides access to an adjoining parcel of land. The Currier <br />Creek crossing may be constructed at any time. <br />The following is a description of each Stage and Phase of the Palomino Fields <br />project. Attached to this Exhibit is a best -case scenario time line which may be <br />effected as described above. <br />Stage 1, Phase 1. Phase 1 will include the development of the first 8 parcels <br />that are located between Reecer Creek Road and the Ellensburg Water <br />Company's canal. This phase will include the Bowers Road extension from <br />Reecer Creek Road to the Ellensburg Water Company canal. Inaddition an <br />acceleration lane on Reecer Road will be constructed during this phase. It is <br />anticipated that Phase 1 will be completed by June of 2016. <br />In addition prior to or during Phase 1 or during any following phase, a model <br />home and/or a real estate sales office may be constructed on lots 72 and/or 73 <br />and operated during the life of the project. The model home and/or a real estate <br />sales office may be accessed, during the life of the project, directly off of Reecer <br />Creek road on a temporary driveway that is located across from where Bender <br />road intersects with Reecer Creek road. The model home and/or a real estate <br />sales office may be served, on a temporary bases, by a 50 gallon, or larger, <br />cistern for potable water, community drain field, and infrastructure from facilities <br />located on Reecer Creek road, including but not limited to, power, phone, internet <br />and cable television until such time that Stage 2 Phase 5 is completed and all <br />services are brought to these lots. Irrigation may be provided by the Ellensburg <br />Water Company out of its ditch for the model home and/or a real estate sales <br />office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.