Laserfiche WebLink
CONSTRUCTTON COSTS (CONT.) <br />Barns 400 horse stalle to be provided.Will build eight 80-stallpost and $6,034,400 <br />beam struc1ares 48-feet wide by 398-feet long with 12 x 12 foot <br />stalls equipped with sliding gates.Ten fann water hydrants <br />located m each structure will provide easy access for exhibitors. <br />Each barn will have two locations for hay storage and retrieval. <br />Electrical power and lighting with control switches will allowsectionallightingcontrol.Each barn will have a concrete horse <br />washing facility. <br />Waste Holding 20 x 30 foot concrete holding pen with raised concrete 40-foot wide $29,900Penwallsonthreesidestofacilitatethedepositingandremovalusingafrontendloader. <br />Entry Roads Clearing and base rock installed under the site development $451,000contract.This project includes the installation of 3"of 3/4 minus <br />topping,graded and rolled with 2"of paving for the 3,000 x 24 footofroadway.Raised curbs and a fence on both sides of the road.A <br />new sign identifying the Washington State Horse Park is included. <br />Walkways,Willfund the development of trails to connect the 68-acres of $516,100PathwaysanddevelopedlandwithintheHorseParksitetotheexistingtrailServiceAreassystemInstallationofwalkwaysandpathwaysbetweenthecoveredarena,parking and exhibitors barns are included.Thistrailsystemwillaccessapproximately80additionalacresthatmay <br />be used for eventing course needs west of the main campus. <br />Composting Area An area near the service road will be cleared and grubbed,328,100 <br />organic material and stumpe removed to clear for a 100 x 60 footpadforthewastematerial.Developmentof the pad will consist of <br />6"of base rock,("of 1 1/4"top rock graded and rolled,and thefinalinstallationof2"ofpaving. <br />Livestock The livestock holding pen will have a 60 x 80 foot pad consisting of $25,000HoldingPens6"of base rock,("of 1 1/4"top rock,and finally 4"of floor <br />material.Perimeter fencing with control gates will complete thisproject. <br />Utilities The scope of this element is the constniction of a 3,100 feet of ditch $728,700fromthepropertytopowertransfomterlocationsprovidedbytheservingutilities.This work includes the installation of securitylightingalongtheroadway,in addition to 1000-feet of ditch andpipingfromtheservingutilityentryontothesitepropertyandto <br />the covered arena.Also included is a 3,000 foot dilch,manhole <br />valves and fire hydrants for the installation from the Sancadia <br />water,sewer and irrigation system to the end of the arena.A low <br />voltage communication and security system will be installed. <br />9