Laserfiche WebLink
CONSfRUCTIONCOSTS (coNT.) <br />Maintenance /Construction of a 40 x 100 foot shop building with a 16-foot ceiling $171,700StorageShop(post and beam structure)near the service road and close to thearenaarea.Work includes clearing,grubbing and installing 6"ofbaserock,4"of 1 1/4"top rock and a 4"concrete pad.14-footentrydoors,man doors.lighting and power will support <br />maintenance operations and storage of equipment and materials.Public Facilities Funds to pay for administration during planning and construction.$1,014,791Administration <br />@ 6.00% <br />Inflation Factor Estimated increase in Consumer Pn e Index applied to Phase 2 31,456,619andPhase3. <br />ToTAI.,PRoJECTCOSTS $19,384,599 <br />I <br />10