My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:53:48 PM
Creation date
1/16/2018 12:00:11 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
mechanical narrative <br />(cont.) <br />3.Sponsor Boxes:A stainless steel sink will be provided in each suite.Point of use, <br />instantaneous electric water heaters will be provided at each sink. <br />4.Restrooms:Commercial vitreous china plumbing fixtures will be provided.Water Closets <br />and Urinals will be wall mounted with sensor operated flush valves.Multi-Station solid <br />surface wash fountain will be floor mounted with sensor operated faucets.Domestic hot <br />water will be provided by point of use,instantaneous hot water heaters.Floor drains will be <br />provided in each toilet room. <br />5.Meeting Room:Floor drain will be provided in this space. <br />6.Concessions:Each half of the East and West Concession Areas will have a 3-compartment <br />stainless steel sink,vitreous china hand wash sink,and stainless steel food prep.sink.In <br />addition,floor sinks and floor drains will be provided as required. <br />5.Behind the Chutes:Stainless steel sinks for the bars will be provided. <br />8.Janitor Rooms:A floor mounted janitor sink will be provided in each of (2)janitorial rooms. <br />9.Point of use,instantaneous,electric water heaters will be provided at all fixtures requiring <br />hot water. <br />kittitas county •ellensburg rodeo arena seating
The URL can be used to link to this page
Your browser does not support the video tag.