My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:53:48 PM
Creation date
1/16/2018 12:00:11 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
electrical narrative <br />Site Electrical <br />1.Electrical Service(s)-Facility Use:Remove and replace existing North &Northwest site <br />electrical service equipment.Existing utility service transformers and conductors will be <br />upgraded to match new service equipment.New service equipment shall be installed in <br />approximately the same locations as the existing service equipment.Minimum amperage <br />rating of the new North service equipment rating shall be 1200A,208V,3PH. <br />2.Electrical Distribution:Remove and Replace existing distribution feeders which are served <br />from the North &Northwest main service equipment.New feeder cabling shall be installed <br />in PVC conduit below grade.Existing branch panels,disconnects and RV pedestals <br />will be replaced at the same locations or at new locations as dictated by the planned <br />improvements.RV Pedestals at outer fence of NW track shall remain and be reconnected <br />to new distribution equipment. <br />Power <br />1,1.General:New electrical distribution systems will be provided for service to areas of the <br />facility where the density of electrical loads justifies a dedicated power panel.The facility <br />distribution system will be 208/120V,3PH,4W.NEC 700 loads such as egress lighting will <br />be provided with battery backup to support lighting in the event that normal power is lost. <br />2.Concessions/Meeting Areas:Each concessions/meeting area will be provided with a <br />dedicated 120/208V branch panel for support of food service loads.Mechanical loads in <br />concessions areas will be served from the concessions panel or a house mechanical panel <br />in the vicinity of the loads. <br />3.Sponsor Boxes:A dedicated panel will be provided in or near the planned Sponsor Boxes. <br />Convenience power outlets will be provided within the Sponsor Boxes per Owner direction. <br />4.Behind the Chutes:A dedicated panel will be provided in or near the area known as <br />"Behind the Chutes".Dedicated 120V power outlets will be provided at the stage for <br />support of temporary band equipment. <br />design development report •also architects (01-24-2017)
The URL can be used to link to this page
Your browser does not support the video tag.