Laserfiche WebLink
electrical narrative <br />Site Electrical <br />1.Electrical Service(s)-Facility Use:Remove and replace existing North &Northwest site <br />electrical service equipment.Existing utility service transformers and conductors will be <br />upgraded to match new service equipment.New service equipment shall be installed in <br />approximately the same locations as the existing service equipment.Minimum amperage <br />rating of the new North service equipment rating shall be 1200A,208V,3PH. <br />2.Electrical Distribution:Remove and Replace existing distribution feeders which are served <br />from the North &Northwest main service equipment.New feeder cabling shall be installed <br />in PVC conduit below grade.Existing branch panels,disconnects and RV pedestals <br />will be replaced at the same locations or at new locations as dictated by the planned <br />improvements.RV Pedestals at outer fence of NW track shall remain and be reconnected <br />to new distribution equipment. <br />Power <br />1,1.General:New electrical distribution systems will be provided for service to areas of the <br />facility where the density of electrical loads justifies a dedicated power panel.The facility <br />distribution system will be 208/120V,3PH,4W.NEC 700 loads such as egress lighting will <br />be provided with battery backup to support lighting in the event that normal power is lost. <br />2.Concessions/Meeting Areas:Each concessions/meeting area will be provided with a <br />dedicated 120/208V branch panel for support of food service loads.Mechanical loads in <br />concessions areas will be served from the concessions panel or a house mechanical panel <br />in the vicinity of the loads. <br />3.Sponsor Boxes:A dedicated panel will be provided in or near the planned Sponsor Boxes. <br />Convenience power outlets will be provided within the Sponsor Boxes per Owner direction. <br />4.Behind the Chutes:A dedicated panel will be provided in or near the area known as <br />"Behind the Chutes".Dedicated 120V power outlets will be provided at the stage for <br />support of temporary band equipment. <br />design development report •also architects (01-24-2017)