My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:53:48 PM
Creation date
1/16/2018 12:00:11 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
mechanical narrative <br />Heating &Ventilating <br />1.New Restrooms:The new restrooms will have exhaust systems in accordance with indoor <br />air quality codes.In addition,the restrooms serving the NW Concessions Area will be <br />heated with electric heaters for cold weather (winter)use. <br />2.Permanent Concessions:There will be a Northeast Concession Area and a Northwest <br />Concession Area.Two Concession areas will have a single Type I cooking exhaust hood, <br />and U.L.listed grease hood exhaust fan.Hood makeup air will originate from roof cowls <br />with automatic dampers to open upon activation of range hood exhaust fan.No cooling or <br />heating will be provided for concession area. <br />3.First Aid Room and behind the Chutes Office will be heated and air-conditioned by a thru- <br />the-wall packaged A.C.unit.("PTAC"). <br />4.Behind the Chutes Bar Area will be ventilated via a roof mounted exhaust fan.No heating or <br />cooling will be provided. <br />5.Meeting Rooms:This area will be ventilated via a roof exhaust fan and air intake louver in <br />accordance with code.No heating or cooling will be provided. <br />6.Storage Rooms/Janitor Rooms:Mechanically ventilated in accordance with Building Code <br />requirements.Unheated. <br />7.Sponsor Boxes:No heat,mechanical ventilation,or air conditioning.It is assumed these <br />areas will open to the outside and have natural ventilation. <br />Plumbing <br />1.General:All areas will be provided with provisions for draining domestic water systems for <br />extended unoccupied periods such as winter:Sinks in Sponsor Boxes,Gold Buckle Club, <br />Toilet Rooms,Concessions,and other miscellaneous areas with plumbing. <br />2.Concourse Areas:Non-freeze water hydrants will be provided for cold weather use. <br />design development report •also architects (01-24-2017)
The URL can be used to link to this page
Your browser does not support the video tag.