Laserfiche WebLink
FHWA Order 4470.1A <br />Appendix A. Contractor Cost Certification <br />Cerdfication of Final Indirect Costs <br />Firm Name: _Jacobs Engineering Group Inc. (North American infrastructure) <br />Indirect Cost Rate Proposal: FY2015: At -Office rate 103.61%:At-Site 82.22yo <br />Date of Proposal Preparation (mmldd/yyyy): 03/15/2016 <br />Fiscal Period Covered (mm/ddlyyyy to mmlddlyyyy): 09/27/2014 to 10/0212016 <br />1, the undersigned, certify that I have reviewed the proposal to establish final <br />indirect cost rates for the fiscal period as specified above and to the best of my <br />knowledge and belief., @ <br />1.) All costs included In this proposal to establish final indirect cost rates are <br />allowable in accordance with the cost principles of the Federal Acquisition a. <br />Regulations (FAR) of title 48, Code of Federal Regulations (CFR), part 31. <br />2.) This proposal does not include any costs which are expressly unallowable <br />under the cost principles of the FAR of 48 CFR 31. <br />All known material transactions or event that have occurred affecting the firm's <br />ownership, organization and indirect cost rates have been disclosed. <br />Signature: <br />Name of Certifying Official (Print): Rose Egidi <br />Title: Vice President - Controller <br />Date of Certification (mm/dd/yyyy): 03/16/2016 <br />