Laserfiche WebLink
Kittitas County Upper Road Maintenance Facility <br />Exhibit A - Scope of Work <br />SCOPE EXCLUSIONS <br />January 8, 2017 <br />The following are excluded from this Scope of Work. At written County request, the Consultant may <br />provide the following services as an amendment to the contract, the fees for services will be drawn from <br />the project Management Reserve or, if expended, other funding source identified by the County. <br />• Selection of furnishings with the exceptions of built -in-place furnishings such as countertops, is <br />excluded. Furnishings including but are not limited to desks, desktop lamps, rolling chairs, and <br />conference room equipment are not included within this scope of work. <br />• Preparation and submittal of documents for mechanical, electrical, and plumbing permits are not <br />included within this scope of work and will be submitted by the selected Contractor at the time of <br />construction. <br />• Meetings and/or presentations to present project status or design with the Board of County <br />Commissioners (BOCC) are not included within this scope of work. <br />• 3D renderings for all project phases. <br />• Fire sprinkler system. <br />• Permanent irrigation system. <br />• Sustainability Services. The project will not be seeking any sustainable certification from <br />organizations such as the USGBC or Living Futures Institute, however, when possible sustainable <br />attributes will be incorporated into the design. <br />• Offsite improvements and/or mitigation. <br />• Roadway improvements to 5 -Mine Road other than patching in order to trench utilities to the <br />project site. <br />• Community outreach and/or public relations services. <br />• Environmental permits and documentation including, SEPA documentation and perform field <br />investigations related to SEPA documentation, Critical Aquifer Recharge Area(s) (CARA) report, TIR <br />Drainage Report. <br />• Assistance with project re -zoning, zone adjustment, or zoning documentation other than code <br />review for project. <br />• Traffic analysis and concurrency evaluation. <br />• Survey and utilities locate services. <br />• See assumptions under each task. <br />• Fuel Facility construction documentation, permitting, bid documentation, and construction <br />documentation. Note: Fuel Facility schematic design for cost estimating will be included as part of <br />Task 2 — Schematic Design. <br />TASK 1- PROJECT MANAGEMENT <br />Task 1 Objective: Management of project team throughout the duration of the project, coordination with <br />project owner, coordination with project team, development and maintenance of project schedule, <br />development of consultant budgets including invoices. <br />Task 1 Work Elements <br />1.01 Resource Management <br />Page 13 Maintenance Facility Design Phase 1 KPG <br />