Laserfiche WebLink
Kittitas County Upper Road Maintenance Facility <br />Exhibit A - Scope of Work <br />January 8, 2017 <br />• Provide earthwork equipment and operator in support of the work of Task 5 Field Investigations. <br />• Complete reviews in a reasonable timeframe, no more than ten (10) working days, in order to <br />maintain project schedule and deliverable milestone goals. <br />• Division 00 and Division 01 specifications including general provisions and construction contract. <br />Overall Project Assumptions: <br />• The initial notice to proceed and authorization of work by the County will be limited to the scope <br />of work contained in Task 1, Task 2, and Task 5. The County will elect to authorize subsequent tasks <br />upon review of the project deliverables at each milestone. KPG will not proceed with subsequent <br />tasks unless authorized in writing by Kittitas County. <br />• Facility configuration will closely match the layout provided by the County in the fall of 2017 which <br />consists of up to four (4) buildings and a laydown area. <br />• Water supply sufficient for project feasibility is available by right to designated site. <br />• Project documentation will be provided as digital .pdf documents, unless elements are required to <br />be printed, such as a building permit submittal. <br />• Project work will be conducted in AutoCAD 2015 or newer, Civil 3D 2015 or newer, and Revit 2017 <br />or newer. <br />• Project deliverables will be on project titleblocks, full-size 22 -inch by 34 -inch, and/or half-size 50% <br />scale 11 -inch by 17 -inch. <br />• The Consultant may shift budget between tasks when authorized in writing by the County. <br />• The Consultant will set-up and maintain the project .ftp site for the project team. <br />• Project specifications will be provided in current CSI masterformat, .pdf 8.5x11 -inch size. Division <br />01 and General Conditions will be provided by the County and reviewed by the Consultant for <br />coordination purposes. <br />• Storm drainage & infiltration on site will follow current code as required by Kittitas County. <br />• Buildings will be procured as Bidder provided pre-engineered structures and outfitted to meet <br />project design plans and specifications. Pre-engineered structures will be submitted as part of a <br />'deferred' permit submittal following low -bid selection of General Contractor and vendor <br />procurement. The vehicle wash station will be a pre -manufactured system using County's specified <br />performance requirements. <br />• Site work and grading will be limited to the project area identified on grading plans and as allowed <br />by Zoning code. <br />• Power, water and cable utilities are available adjacent to the site. <br />• The project will be publicly bid and construction work will be performed by the successful bidder. <br />• Design work for all programmed buildings and site elements shall be completed concurrently. It is <br />assumed the Consultant will provide "Bid Ready' documents and the County may elect to delay <br />the construction of one or more elements after completion of bid documentation in order to meet <br />construction schedule and budget criteria. The design team will assist with pre -planning potential <br />phasing as part of the schematic design task. <br />• A future on-site fuel facility will be planned and cost estimated as part of Schematic Design task. <br />Utilities to area designated for fuel facility will be designed as stub -in for future use. <br />Page 12 Maintenance Facility Design Phase 1 KPG <br />