HomeMy WebLinkAboutCITY OF CLE ELUM WSHP LARGE CAP APPLICATIONKittitas County Lodging Tax Fund Application Draft
I. Applicant Information
Project Title: Washington State Horse Park Facilities Expansion
Applicant Name/Organization: City of Cle Elum
Contact Person: Matthew Lundh
Phone: 509-304-4576
Email: mlundh@cleelum.gov
Mailing Address: 119 W 1st St, Cle Elum, WA 98922
II. Project Overview
1. Project Description
The Washington State Horse Park (WSHP) is seeking funding from the Kittitas County Lodging
Tax Fund to expand essential infrastructure that will increase event capacity, improve site
logistics, and strengthen tourism across Kittitas County. Located within the City of Cle Elum,
WSHP is a scenic, multi-use equestrian and recreational facility that currently draws
approximately 38,000 visitors annually.
The purpose of this infrastructure project is to meet growing demand by enhancing the Park’s
ability to host larger and more concurrent events, and to accommodate a broader range of
users including equestrian competitors, spectators, recreational RV travelers and outdoor
enthusiasts. Funding would specifically support the following key improvements:
• Perimeter security fencing along our northern boundary where the new developer(s)
of the UGA plans to create a multi-use public pathway as an element of its initial site
plans. This pathway will be within approximately 50 feet of the park’s competition
arenas and maintenance storage facilities, creating significant safety and security
concerns. Installing this fence is a top priority.
• 50 additional RV sites to help remedy consistent sell-out of hook-ups, attract new
events that require more capacity and host non-equestrian RV travelers, expanding
year-round use.
• 11 Permanent barn pads to accommodate 220 stalls currently erected seasonally in
the spectator parking lot. Having permanent pads will reduces labor costs, free up
essential parking space, and improve the customer experience as well as emergency
response capabilities by keeping roads and RV zones clear.
• 80 new parking spaces to reduce congestion, support larger crowds, improve ADA and
emergency access, and streamline traffic flow.
• Portable bleachers to improve the spectator experience and safely increase event
capacity. They will be portable and can be moved to any location where seating is
needed.
• Arena expansion to serve our largest current events, attract additional regional and
national competitions, support simultaneous multi-discipline activities, and bring more
out of county visitors to the grounds.
• Restrooms, lighting, and amenities that elevate the overall user experience and meet
increasing visitor expectations.
With upgraded facilities, the Park will attract more visitors, benefiting hotels, restaurants, local
businesses, and service providers, while also creating safer, more accessible, and comfortable
infrastructure for participants, spectators, vendors, and families. By retaining and growing equine
and non-equine events that bring people together, the project fosters quality of life in Kittitas
County, community pride, and long-term economic resilience.
This project is planned for full implementation in a single phase to maximize its impact and
benefits. However, if full funding is not available, WSHP has planned its expansion with a
flexible approach that prioritizes the most urgent improvements. Funding would be directed
toward critical safety and capacity-building elements that enable the Park to operate efficiently
and attract more business, which results in increased tourism revenue for the region. The
reduced scope would include these priorities:
• Security fencing
• 11 permanent barn pads for 220 stalls
• 32 additional RV sites
• 73 new parking spaces
• Portable bleachers
This scaled-back implementation would delay providing restroom facilities, ambient lighting
throughout the site, vendor area utilities, ancillary maintenance and office structures,
pedestrian/vehicular/horse separation fencing, and directional signage. This phased approach
would reduce our overall grant request by about $1m to a total of $3,275,000. Even at a
reduced scope, the investment delivers significant benefits for the county tourism and
hospitality industries.
Full Buildout Site Plan:
https://cityofcleelum.sharepoint.com/:i:/g/EdaWPJFoYflGvsHM31HeTdwBepoGLj3LDJtA9l8TE
ND3bg?e=Dh9Av7
2024 Economic Impact Study (referenced below):
https://cityofcleelum.sharepoint.com/:b:/g/EROatsL5Hk5Mrra937S1sukByWwllg7b3bqqbYk22OP1wA
?e=QDAvWN
2. Tourism Benefit
The proposed expansion of the WSHP will strengthen Kittitas County’s tourism economy by
increasing visitor capacity, enhancing event quality, and expanding year-round recreational
access. WSHP currently draws 38,000 visitors annually of which 81% are from outside the
County. According to a 2024 economic impact study conducted in partnership with Central
Washington University, WSHP contributes $4.23 million in economic activity each year.
The proposed improvements will enable WSHP to:
• Host a greater volume of equestrian events and grow attendance
• Attract more overnight visitors who spend on lodging, dining, fuel, and retail
• Attract larger events and increase weekend capacity through multi-event
scheduling
• Open RV accommodations to non-equestrian recreational travelers in a growing region
with limited camping options
Equine tourism is a high-impact economic opportunity for Kittitas County. According to the
American Horse Council Economic Impact Study, Americans spend nearly $27 billion annually
on horse-related travel—revealing a powerful market with more opportunity. More than a hobby,
the equine industry is a significant and often overlooked driver of tourism, fueled by travelers
who routinely journey for competitions, training, and recreational experiences. With the
proposed infrastructure improvements, the WSHP is poised to solidify its role as a premier
equestrian venue in the Pacific Northwest. This positions Kittitas County to emerge as a
regional hub for equine tourism. Since opening, WSHP has contributed more than $40 million
in cumulative economic impact, underscoring its proven value as a cornerstone of the Kittitas
County tourism economy.
3. Target Users
The primary users of this infrastructure include equestrian competitors participating in events,
spectators and families attending regional competitions, recreational travelers and RV users
seeking year-round camping options, and outdoor enthusiasts drawn to Central Washington for
its natural beauty and recreational opportunities. This diverse user base supports both tourism
and local economic activity throughout the County.
III. Budget and Funding
1. Project Budget Breakdown**
Expense Item Cost Funding Source Status
Design & Planning $425,000
Construction
Materials
$1,870,000
Labor/Contractor
Fees
$1,870,000
Permits & Fees $60,000
Marketing/signage $50,000
Maintenance (year 1) -
Total $4,275,000
As noted earlier, a phased approach would reduce our overall grant request by about $1m to a total
of $3,275,000
2. Funding Sources
County Large Capital Grant – $4,275,000– in process
State Capital Budget Request – $375,000 – Awarded, awaiting contract.
In kind Services - $150,000
3. Long-Term Maintenance Plan
The WSHP has a proven track record of sustaining long- term infrastructure investments through
responsible financial management and diversified revenue generation. Since opening in 2010,
WSHP has successfully balanced state, local, and private funding with event-generated income
to support operations, maintenance, and strategic growth.
Many of the planned upgrades involve ground improvements and amenities that require minimal
ongoing maintenance while delivering significant long-term benefits. Expanded facilities will
enable WSHP to generate consistent revenues through:
• Increased Event Revenue: With more use of stalls, parking, and RV hookups, the
Park can also increase revenue through participant fees, ticket sales, vendor
agreements, and facility rentals.
• Enhanced Sponsorship and Donations: Improved infrastructure and rising attendance
will attract new sponsorships and donor investments, including naming rights and
targeted support for community and youth programs.
• Non-Equine and Off-Season Use: Expanded RV accommodations and improved
amenities will draw recreational travelers, outdoor enthusiasts, and retreat groups during
off-peak times, generating income outside of the traditional equine event season.
• Youth and Community Engagement: Educational programs and equestrian camps will
contribute additional revenue while fostering long-term community connection and
support.
Together, these revenue streams will ensure ongoing maintenance and the long-term viability of
the Park’s infrastructure.
IV. Project Timeline
Planning & Permits: Start 2025 – Complete 2026
Construction Start: Spring 2026
Project Completion: Fall 2027
Opening to Public: Open during construction
V. Feasibility and Risk Management
1. Feasibility
The WSHP project is highly feasible, backed by a strong track record of sustainable operations,
diversified funding, and successful capital project implementation. To date, the Park has
secured over $11.5 million in public and private investment, including $5.8 million in State
Capital Funds, $2.4 million from county and city sources, $5.3 million in operating revenue, and
more than $2.7 million in private donations—complemented by in-kind support and over
$650,000 in volunteer contributions.
The project site is already secured and shovel ready, eliminating acquisition delays and allowing
construction to begin promptly. WSHP has worked with experienced contractors to create full
buildout plan and has identified resources to support the construction of our project upon
funding. We also have a ongoing relationship with the local and regional fire agencies which
has helped us stay abreast of emerging fire safety requirements.
A phased plan provides additional flexibility, enabling WSHP to prioritize critical infrastructure
upgrades and adapt to available resources without compromising long term outcomes. With this
foundation in place, the Park is well-positioned to complete the proposed improvements on time
and deliver lasting economic and community benefits.
2. Risk Management
Potential risks for the WSHP infrastructure project include construction delays or budget
overruns. These risks are mitigated through a well-established phased approach that allows the
project to scale based on available funding, ensuring that the most urgent and high-impact
improvements can move forward even if full funding is not immediately available. WSHP also
maintains strong relationships with experienced vendors, contractors, and community
sponsors, which helps manage costs, streamline timelines, and provide additional support if
unexpected challenges arise. This combination of flexibility, planning, and trusted partnerships
positions the project for successful and timely completion.
VI. Tourism Metrics and Success Measurement
Increase tourist visits: Visitor counts via surveys/counters – Target: 5–7% annual growth
Boost overnight stays: Lodging/RV records – Target: +2,500 RV nights
Enhance visitor experience: Survey feedback – Target: 90%+ positive ratings
Build community partnerships: Partnership tracking – Target: 5–10 new collaborations
Development, construction and operations of these planned improvements will rely on local
construction firms, materials and supplies from a wide variety of local businesses, and additional
labor. Opportunities will emerge to collaborate more fully with the Cle Elum Downtown Association,
Chamber of Commerce, an array of local civic, social, recreational groups and schools that may
need camping space for their event attendees or activities that require large arena/parking areas,
etc.
VII. Certification
I certify that the information provided in this application is true and complete to the best of my
knowledge. I further certify that I understand the eligibility requirements and that this project
complies with the requirements of RCW 67.28.1816.
Signature: ___________________________
Name: Matthew Lundh
Title: Mayor
Date: June 30, 2025