Laserfiche WebLink
• Arena expansion to serve our largest current events, attract additional regional and <br />national competitions, support simultaneous multi-discipline activities, and bring more <br />out of county visitors to the grounds. <br />• Restrooms, lighting, and amenities that elevate the overall user experience and meet <br />increasing visitor expectations. <br />With upgraded facilities, the Park will attract more visitors, benefiting hotels, restaurants, local <br />businesses, and service providers, while also creating safer, more accessible, and comfortable <br />infrastructure for participants, spectators, vendors, and families. By retaining and growing equine <br />and non-equine events that bring people together, the project fosters quality of life in Kittitas <br />County, community pride, and long-term economic resilience. <br />This project is planned for full implementation in a single phase to maximize its impact and <br />benefits. However, if full funding is not available, WSHP has planned its expansion with a <br />flexible approach that prioritizes the most urgent improvements. Funding would be directed <br />toward critical safety and capacity-building elements that enable the Park to operate efficiently <br />and attract more business, which results in increased tourism revenue for the region. The <br />reduced scope would include these priorities: <br />• Security fencing <br />• 11 permanent barn pads for 220 stalls <br />• 32 additional RV sites <br />• 73 new parking spaces <br />• Portable bleachers <br />This scaled-back implementation would delay providing restroom facilities, ambient lighting <br />throughout the site, vendor area utilities, ancillary maintenance and office structures, <br />pedestrian/vehicular/horse separation fencing, and directional signage. This phased approach <br />would reduce our overall grant request by about $1m to a total of $3,275,000. Even at a <br />reduced scope, the investment delivers significant benefits for the county tourism and <br />hospitality industries. <br /> <br />Full Buildout Site Plan: <br />https://cityofcleelum.sharepoint.com/:i:/g/EdaWPJFoYflGvsHM31HeTdwBepoGLj3LDJtA9l8TE <br />ND3bg?e=Dh9Av7 <br /> <br />2024 Economic Impact Study (referenced below): <br />https://cityofcleelum.sharepoint.com/:b:/g/EROatsL5Hk5Mrra937S1sukByWwllg7b3bqqbYk22OP1wA <br />?e=QDAvWN <br /> <br />2. Tourism Benefit <br />The proposed expansion of the WSHP will strengthen Kittitas County’s tourism economy by <br />increasing visitor capacity, enhancing event quality, and expanding year-round recreational <br />access. WSHP currently draws 38,000 visitors annually of which 81% are from outside the <br />County. According to a 2024 economic impact study conducted in partnership with Central <br />Washington University, WSHP contributes $4.23 million in economic activity each year.