Laserfiche WebLink
<br /> <br /> <br /> P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br /> ELLENSBURG, WA 98926 <br /> 509-925-9747 <br /> brandon@belsmith.com <br /> <br /> <br /> <br /> <br /> <br /> <br />January 29, 2025 <br /> <br /> <br /> <br /> <br />Re: Change Order Proposal #09 <br /> <br />Per the description below, we offer the following change order proposal #09 (COP#09). <br /> <br />COP 09 includes all labor, materials, and equipment necessary for encompassing the concrete <br />changes listed below. Attached is a sheet including all changed tasks with pricing and a <br />spreadsheet that breaks down the original bid cost to the new revised cost. <br /> <br /> <br /> <br />Total cost to be implemented into the contract: $ 280,980.58 + WSST <br /> <br /> <br /> <br />Time extension required: 0 days <br /> <br /> <br /> <br />Sincerely, <br /> <br /> <br />Brandon Drexler, <br />Belsaas & Smith Construction