Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #9 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTS EQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST <br />Transfer Concrete Changes <br />Outside tunnel Footings 1 LS 0.00 160 0 <br />Inside tunnel footings 1 LS 0.00 7,290 0 0 <br />Stair Footing 1 LS 0.00 (23,400)0 0 <br />Outside tunnel wall 1 LS 0.00 (80,680)0 0 <br />Tunnel wall to bottom of slab 1 LS 0.00 31,150 0 0 <br />Pushwall 1 LS 0.00 39,100 0 0 <br />Piers Increase height 1 LS 0.00 6,380 0 0 <br />Bollards 10 EA 1 LS 0.00 9,000 0 0 <br />Retaining wall footings 1 LS 0.00 63,700 0 0 <br />Added Exterior 4' wall 1 LS 0.00 35,380 0 0 <br />Exterior Retaining walls 1 LS 0.00 91,040 0 0 <br />Added cold weather protection 1 LS 0.00 17,600 0 0 <br />Concrete sidewall 1 LS 0.00 816 0 0 <br />Exterior concrete curb 1 LS 0.00 21,220 0 0 <br />Additional Rebar 1 LS 0.00 25,576 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />*TOTALS 0 244,332.00 0 0