My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025_10_29 Ellensburg Rodeo Grandstand Proposal_
>
Meetings
>
2025
>
11. November
>
2025-11-04 10:00 AM - Commissioners' Agenda
>
2025_10_29 Ellensburg Rodeo Grandstand Proposal_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 12:02:52 PM
Creation date
10/30/2025 12:02:47 PM
Metadata
Fields
Template:
Meeting
Date
11/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Nor-Pac Seating
Order
4
Placement
Consent Agenda
Row ID
137354
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />DIRECT <br />PRICE QUOTATION <br /> <br />TO: Patti Stacey <br />Facilities & Waste Operations <br />925 Industrial Way <br />Ellensburg, WA 98926 <br /> <br /> <br />DATE: October 30, 2025 <br />PROJECT: Ellensburg Rodeo Grandstand <br />Project <br />SALESMAN: T. Barrows <br />EST. SHIP DATE: Feb 2026 <br />TERMS: NET 30 <br />FREIGHT INCLUDED <br />INSTALLATION: INCLUDED <br />SALES TAX: WSST EXCLUDED <br /> <br />QUOTE VALID FOR 30 DAYS <br /> <br />WE PROPOSE TO FURNISH AND INSTALL THE FOLLOWING DANT CLAYTON <br />CORPORATION GRANDSTANDS AS FOLLOWS PER SOURCEWELL CONTRACT # <br />081523-DCT. <br /> <br />BASE BID: <br /> <br /> <br />1. Materials and installation of the Grandstand per latest drawings (see <br />attached progress set). <br />2. 110” Elevated stand <br />3. Rise/Run of 14/33. <br />4. Galvanized Steel Understructure. <br />5. Galvanized Misc. Steel Components (i.e. seat brackets, angle clips, etc..) <br />6. Welded decking with Mill finish. <br />7. Anodized risers. <br />8. Anodized Aluminum riser closure at stairs only. <br />9. Anodized bench Seating. <br />10. Anodized Backrests on last row only. <br />11. Galvanized CLF guard railing were indicated on the attached. <br />12. Guardian VPR with E-Coat Finish were indicated on the attached.
The URL can be used to link to this page
Your browser does not support the video tag.