Laserfiche WebLink
<br /> <br /> <br />13. ~70’ bridge with double wide stair. <br />14. (9) Egress Stairs. <br />15. Mid-Aisle Rails. <br />16. Intermediate Steps in Aisles. <br />17. Roof Canopy – Decking and Purlins. <br />18. Railing and brackets for Hussey Quantum Chairs <br />19. Parapet railing at rear of grandstand, constructed with PBR panels. <br />20. (2) location at grade with PBR closure walls. <br />21. Co-Op Sourcewell Fees <br />22. Approx. 400 beam mounted (concrete and grandstands) Hussey/Camatic <br />‘Quantum” style chairs complete with seat/row numbers and cupholders <br />per location on the drawings. Standard finishes/colors. <br />23. Approx. 25 portable chairs (MS-100) by Spec Seating as shown on drawings <br />with removable arms/cupholders. <br />24. 10% deposit due at time of order entry. Progress billings net 30 days from <br />receipt of invoice (schedule of values will be provided). Maximum of 5% <br />retainage. <br /> <br /> <br /> <br /> <br />BASE BID MATERIALS DELIVERED AND INSTALLED SOURCEWELL CONTRACT <br />#081523-DCT PER ATTACHED PROGRESS DRAWINGS DATED 10/29/2025. <br /> <br /> $5, 805, 061.00 <br /> <br /> <br /> <br /> <br /> <br />INCLUDES: STANDARD INSURANCE COVERAGE FOR NOR-PAC/SUB- <br />CONTRACTORS, PAYMENT AND PERFORMANCE BOND, <br />CARPENTER/LABOR PREVAILING WAGE RATE INSTALL, <br />MATERIALS DELIVERED FOB SITE AND ASSOCIATED EQUIPMENT. <br /> <br />EXCLUDES: SALES TAX, PERMITS AND ASSOCIATED FEES, DEMO OF <br />EXISTING, CONCRETE/DIRT WORK, WINTER CONDITION DELAYS, <br />UNION LABOR AGREEMENT LIQUIDATED DAMAGES, NON- <br />STANDARD INSURANCE, ELECTRICAL CONNECTIONS.