My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP11 SEACON Design Changes
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
COP11 SEACON Design Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:11:00 PM
Creation date
2/27/2025 12:09:02 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 for the Lower County Transfer Station
Order
6
Placement
Consent Agenda
Row ID
128215
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br /> ELLENSBURG, WA 98926 <br /> 509-925-9747 <br /> brandon@belsmith.com <br /> <br /> <br /> <br /> <br /> <br /> <br />January 30, 2025 <br /> <br /> <br /> <br /> <br />Re: Change Order Proposal #11 <br /> <br />Per the description below, we offer the following change order proposal #11 (COP#11). <br /> <br />COP 11 includes the cost associated with adding the additional siding, insulation, and structural <br />members listed out in item 2 of SEACONS price sheet . <br /> <br /> <br /> <br />Total cost to be implemented into the contract: $ 21,172.26+ WSST <br /> <br /> <br /> <br />Time extension required: 0 days <br /> <br /> <br /> <br />Sincerely, <br /> <br /> <br />Brandon Drexler, <br />Belsaas & Smith Construction
The URL can be used to link to this page
Your browser does not support the video tag.