Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #11 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTSEQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST <br />Transfer PEMB CO <br />Additional insualtion, banded linear system, siding 1 LS 0.00 16,870.00 0 <br />Seacon B&O/PL-PD @1.49 1 LS 0.00 251.36 0 0 <br />SeaCon Margin @8%1 LS 0.00 1,369.70 0 0 <br /> 0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />*TOTALS 0 18,491.06 0 0