My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-27-minutes-public-works-study-session
>
Meetings
>
2016
>
10. October
>
2016-10-04 10:00 AM - Commissioners' Agenda
>
2016-06-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:30:52 PM
Creation date
5/12/2020 1:30:25 PM
Metadata
Fields
Template:
Meeting
Date
10/4/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32188
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�sU.oFs ...'ro o»Ec <br />��t olr <br />KITi1Tg5 COUNTY <br />THOSE PRESENT: <br />GUESTS PRESENT: <br />KZTTZ13V1A.1S COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Mark Cook, Director <br />REQUEST TO APPROVE A <br />RESOLUTION FOR A CALL <br />FOR SEALED BIDS FOR THE <br />SILICA ROAD BRIDGE <br />REPLACEMENTAND TO <br />AUTHORIZE THE DIRECTOR <br />OF PUBLIC WORKS TO SIGN <br />PROCUREMENT DOCUMENTS: <br />STUDY SESSION MINUTES <br />June 27. 2016 <br />Obie O'Brien, Laura Osiadacz (BOCC), Mark Cook, Luke <br />Huck, Candie Leader (DPW), Doc Hansen, Mike Flory, <br />Angela San Filippo, Steph Mifflin (CDS), Neil Caulkins (PA) <br />None <br />Mark Cook presented a Resolution to Call for Sealed Bids for <br />the Silica Road Replacement. Mark gave background on the <br />removal of the bridge and the damage that helped make that <br />decision. After the removal Kittitas Reclamation District, <br />Kittitas Valley Fire and Rescue and the Kittitas County PUD <br />No. 1 reported that the structure was used by them and <br />requested to replace the bridge. Staff did some research and <br />have found a solution to put in a 25' bridge. The pricing <br />should be under the $40,000.00. Anticipating a small number <br />of response and the Small Works Roster will be used to solicit <br />bids and also advertised in the newspaper of record. <br />Discussion was held. <br />Board Direction: Commissioner Osiadacz made a motion to approve <br />Resolution 2016-083 for the authorization for a Call for <br />Bids for the Silica Road Bridge Procurement. <br />Commissioner O'Brien seconded the motion. No <br />discussion. <br />OTHER BUSINESS: Mark stated he has six other items to add under other <br />business. <br />Luke Huck reported that the City of Ellensburg submitted a <br />request to put in a bike path through the John Wayne Trail at <br />Alder down 8th — they would like a guide sign and arrows <br />painted along the path. Luck stated that they went ahead and <br />approved the sign placement. The Board of County <br />Commissioners does not need to approve this sign only <br />regulatory signage. <br />411 N. Ruby, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.