My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Coleman Creek_KnifeRiver
>
Meetings
>
2020
>
04. April
>
2020-04-21 10:00 AM - Commissioners' Agenda
>
Resolution_Coleman Creek_KnifeRiver
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 12:48:11 PM
Creation date
4/16/2020 12:48:03 PM
Metadata
Fields
Template:
Meeting
Date
4/21/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Suspend Procurement Procedures (RCW Chapter 39) and Authorize the Public Works Director to Negotiate a Bridge Procurement Contract with KnifeRiver and Sign Same Upon Successful Negotiations
Order
11
Placement
Consent Agenda
Row ID
61782
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: April 21, 2020 <br />ACTION REQUESTED: Request to Approve a Resolution to Suspend Procurement <br />Procedures (RCW Chapter 39) and Authorize the Public <br />Works Director to Negotiate a Bridge Procurement <br />Contract with KnifeRiver and Sign Same Upon Successful <br />Negotiations <br />BACKGROUND: Recent attempts to procure a fish passage structure for CRP <br />299-19 (Coleman at Vantage Highway) produced no <br />responders. One company, KnifeRiver Precast, did request <br />to submit an electronic bid owing to travel restrictions <br />imposed by the Governor's Office. Public Works declined <br />to accept an electronic bid. The declared State of <br />Emergency allows the suspension of standard procurement <br />(RCW Chapter 39) procedures (DPA Caulkins) enabling <br />direct negotiations with KnifeRiver on a suitable bridge <br />structure. Public Works is requesting authorization for the <br />Director to negotiate and sign the bridge procurement <br />contract. Time is of the essence as work in water windows <br />are short and rapidly approaching. WA Department of Fish <br />and Wildlife have qualified this project under RCW <br />77.55.181 as a fish barrier removal project — giving it high <br />priority status. <br />INTERACTION: Public Works. <br />RECOMMENDATION: Suspend RCW Chapter 39 procurement procedures <br />allowing the Director of Public Works to negotiate and sign <br />a bridge procurement contract with KnifeRiver Precast for <br />CRP 299-19. <br />HANDLING: Return one original to Public Works. <br />ATTACHMENTS: Resolution. <br />LEAD STAFF: Mark R. Cook, Director. <br />
The URL can be used to link to this page
Your browser does not support the video tag.