My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionCallforBidsUniversityWayBridge (2)
>
Meetings
>
2018
>
07. July
>
2018-07-03 10:00 AM - Commissioners' Agenda
>
ResolutionCallforBidsUniversityWayBridge (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2018 10:13:09 AM
Creation date
6/29/2018 10:13:05 AM
Metadata
Fields
Template:
Meeting
Date
7/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve a Notice of Call for sealed bids for the University Way Bridge #88341 Repair.
Order
8
Placement
Consent Agenda
Row ID
46040
Type
Call for bids
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />STUDY SESSION STAFF REPORT <br />AGENDA DATE: July 3`d, 2018 <br />ACTION REQUESTED: Approve a Notice of Call for Sealed Bids for the University <br />Way Bridge #88341 Repair Project <br />BACKGROUND: The University Way Bridge over the BNSF railroad tracks <br />is need of repair. Damage to the superstructure has been <br />identified on the girders and the cross beams. <br />Additionally settlement at both bridge approaches has been <br />identified resulting in increased impact loading to the <br />bridge and uneven ride. <br />This project will repair the damaged superstructure and <br />install approach slabs. The contract will require early cure <br />high strength concrete to expedite construction. A two <br />week closure will be required to accommodate the <br />construction as traffic is not manageable over the bridge <br />due to conflicts with width and concrete cure efforts. This <br />closure will not be permitted over rodeo week. <br />Resolution 2017-058 funding the shortfall of $445,000 for <br />the construction of the Dolarway Roundabout, required the <br />County to move forward with the required repairs. <br />The Engineers estimate for the proposed project is <br />approximately $200,000. Kittitas County Public Works has <br />received $129,750 in federal funds from the Surface <br />Transportation Block Grant program for this project. <br />Bids are scheduled to be opened on July 31s`, 2018 at 10:00 <br />a.m. in the Public Works Department. <br />INTERACTION: Public Works <br />RECOMMENDATION: Move to approve Notice of Call for Sealed Bids for the <br />University Way Project. <br />HANDLING: Return one (1) copy to Public Works <br />ATTACHMENTS: Notice of Call for Bids <br />LEAD STAFF: Sara Folk, Engineering Services Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.