Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #78 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE 750.00 0.00 2,484 5,991.40 <br />OVERHEAD 3%22.50 0.00 74.52 179.74 <br />PROFIT 10%77.25 0.00 255.86 617.11 <br />BONDING 1.5%12.75 0.00 42.22 101.82 <br />SUB TOTAL 772.50 0.00 2,857 6,890.08 <br />SUB TOTAL 773 0.00 2,856.71 6,890 <br />LABOR 6,890 <br />MATERIAL 2,856.71 <br />EQUIPMENT 773 <br />SUBCONTRACTORS 0.00 <br />SUB TOTAL SUB TOTAL 10,519.29 <br />GRAND TOTAL TOTAL 10,519.29 <br />TIME EXTENTION REQUIRED:0 <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.