My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP78 MRW North Wall Structural Revision
>
Meetings
>
2026
>
10. October
>
2026-10-06 10:00 AM - Commissioners' Agenda
>
COP78 MRW North Wall Structural Revision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2026 12:15:24 PM
Creation date
10/1/2026 12:14:53 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 16 for the New Transfer Station
Order
3
Placement
Consent Agenda
Row ID
149866
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #78 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE 750.00 0.00 2,484 5,991.40 <br />OVERHEAD 3%22.50 0.00 74.52 179.74 <br />PROFIT 10%77.25 0.00 255.86 617.11 <br />BONDING 1.5%12.75 0.00 42.22 101.82 <br />SUB TOTAL 772.50 0.00 2,857 6,890.08 <br />SUB TOTAL 773 0.00 2,856.71 6,890 <br />LABOR 6,890 <br />MATERIAL 2,856.71 <br />EQUIPMENT 773 <br />SUBCONTRACTORS 0.00 <br />SUB TOTAL SUB TOTAL 10,519.29 <br />GRAND TOTAL TOTAL 10,519.29 <br />TIME EXTENTION REQUIRED:0 <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.
The URL can be used to link to this page
Your browser does not support the video tag.