Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #78 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTS EQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST <br />MRW North Wall <br />Materials <br />CWallA Steel Framing 1 LS 2484.11 <br />SeaCon <br />Labor <br />Carpenter (2EA - 3 Days)60 HR 93.99 5,639 <br />Office 4 HR 88.00 352 <br />0 <br />Equipment <br />Boom Lift 2 Weeks 3 DAY 250.00 750.00 <br />*TOTALS 750 0.00 2,484 5,991