Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #77 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE 0.00 14,139.62$ 0 264.00 <br />OVERHEAD 3%0.00 424.19$ 0.00 7.92 <br />PROFIT 10%0.00 1,413.96$ 0.00 27.19 <br />BONDING 1.5%0.00 212.09$ 0.00 4.49 <br />SUB TOTAL 0.00 16,189.86$ 0 303.60 <br />SUB TOTAL 0 16,189.86$ 0.00 304 <br />LABOR 304 <br />MATERIAL 0.00 <br />EQUIPMENT 0 <br />SUBCONTRACTORS 16,189.86 <br />SUB TOTAL SUB TOTAL 16,493.46 <br />GRAND TOTAL TOTAL 16,493.46 <br />TIME EXTENTION REQUIRED:0 <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.