Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #77 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTS EQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST <br />ASP Added Fencing <br />M2 Quote 1 LS 14,139.62$ <br />Project Manager 3 HR 88.00$ 264.00$ <br />*TOTALS 0 14,139.62$ 0 264