My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Balefill Cost Allocation Memo 20260812
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
Balefill Cost Allocation Memo 20260812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:06:36 PM
Creation date
8/27/2026 12:06:30 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Reimburse from Ryegrass Balefill Post-Closure Reserve for Documented Post-Closure Costs
Order
10
Placement
Consent Agenda
Row ID
148367
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br />719 2nd Avenue, Suite 200 • Seattle, WA 98104 | 206.394.3700 | Parametrix.com <br />DATE: August 12, 2026 <br />TO: Patti Stacy & Jesse Cox <br />FROM: Tiffany Neier, PE <br />SUBJECT: Allocation Method & Tables <br />PROJECT NUMBER: 553-1763-011 <br />PROJECT NAME: Kittitas County Solid Waste On-call <br /> <br />Purpose <br />This appendix summarizes the allocation basis used to assign Ryegrass Facility (Facility) costs <br />between the closed Ryegrass Balefill Landfill (Balefill Landfill) and the active Ryegrass Limited <br />Purpose Landfill (LPL). The allocation method is based on the monitoring program, monitoring <br />locations, monitoring frequency, landfill-specific monitoring activities, and reporting effort described <br />in the annual environmental monitoring reports (Parametrix 2025; Parametrix 2026). <br />Costs were assigned directly when the available information identified a specific landfill unit or work <br />item. Costs associated with combined Facility monitoring or reporting were allocated using the <br />percentages summarized in this appendix. <br />Groundwater Monitoring Basis <br />Groundwater monitoring includes Balefill Landfill-only, LPL-only, and shared monitoring locations. <br />Balefill Landfill groundwater monitoring is completed semiannually. LPL groundwater monitoring is <br />completed quarterly. Well B8 was added to both monitoring programs in 2025. <br />Table 1. Groundwater Monitoring Basis <br />Monitoring Location <br />Balefill <br />Landfill LPL Allocation Basis <br />B2 Yes No Balefill Landfill monitoring location. <br />B3 Yes Yes Shared location. <br />B4 Yes No Balefill Landfill monitoring location. <br />B5 Yes No Balefill Landfill monitoring location. <br />B6 Yes No Balefill Landfill monitoring location. <br />Poison Spring Yes No Balefill Landfill monitoring location. <br />B7 No Yes LPL monitoring location. <br />Clerf #4 Spring No Yes LPL monitoring location. <br />B8 Yes Yes Shared upgradient location added to both monitoring programs. <br />Source: Parametrix 2025; Parametrix 2026.
The URL can be used to link to this page
Your browser does not support the video tag.