Laserfiche WebLink
<br />KVEC RV Park <br />August 13, 2026 <br />Page 7 of 9 <br /> <br />25 N Wenatchee Ave, Suite 238  Wenatchee, WA 98801  Office 509.886.3265  Fax 360.352.1509  scjalliance.com <br />Phase 99 Expenses <br />Expenses will be invoiced on a time and material basis and include items such as mileage, plan reproduction, <br />submittal delivery, copies, etc. <br />Understanding/Assumptions <br />1) No offsite improvements (i.e. transportation, utility, etc.) are included in this scope of work. <br />2) It is assumed the SEPA will not be appealed by the public. <br />3) SEPA/permit fees will be paid by the applicant. <br />4) We have budgeted one resubmittal to the City based on their review of the 90% documents. <br />Additional submittals will be billed under Phase 98 on a time and materials basis. <br />5) Changes to the site layout initiated or approved by the Client will be tracked via time and <br />materials to Phase 98 <br />6) Bid advertisement, including bid proposal sheet development, and Construction Support are <br />not part of scoped services. Upon County readiness, we can prepare an amendment for <br />additional services. <br />7) Assume only one submittal for the building permit. <br />8) UIC Registration is for one facility only. <br />9) Irrigation point-of-connection?? <br />10) No off-site frontage landscape, street tree, sidewalk, or frontage restoration design unless <br />required by the City during permit review. <br /> <br /> <br /> <br />