My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0818 Kittitas County 2022 On Call Amendment 9 SCJ Alliance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-0818 Kittitas County 2022 On Call Amendment 9 SCJ Alliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:44 PM
Creation date
8/27/2026 12:05:13 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Amendment #9 with SCJ for the Cle Elum Transfer Tank Replacement Project
Order
22
Placement
Consent Agenda
Row ID
148367
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment 9 <br />August 12, 2026 <br />Page 3 of 4 <br /> <br /> <br /> <br />25 N Wenatchee Ave, Suite 238 Wenatchee, WA 98801 Office 509.886.3265 Fax 360.352.1509 scjalliance.com <br /> <br />Task 6 Materials Testing (CSI) <br />1) Material testing of the Construction phase to review and confirm the materials use and <br />placement. Construction Special Inspection (CSI) was used for these services as a subconsultant <br />to SCJ. <br />Understanding/Assumptions <br />1) Advertising fees will be paid by the County directly. <br />2) We do not anticipate or estimate topographic surveys, cultural resources, or biological <br />assessments. If the project later identifies this need, we can add it as an amendment. <br />3) Construction Services for this project will be assessed at the time of bid award. The scope of <br />those services will be added via addendum once they have been quantified. <br />4) Stormwater design is not required. <br />5) There are no other conveyance, mechanical, or infrastructure changes or updates to the system <br />(or others) required outside of the existing tank. <br />6) We estimate restoring the project to its existing condition and use. <br />7) This estimate assumes one public bid and award process. <br />Deliverables <br />8) Preliminary Contract Plans. <br />1) Preliminary Cost Estimate. <br />2) City/County Plan submittal package. <br />3) DOH Notification. <br />4) Contract Plans. <br />5) Special Provisions. <br />6) Project Manual (PS&E). <br />7) Addendum. <br />8) Bid Tabulation. <br />9) Bid Award Notification. <br />10) Approved Bid Tabs - pdf <br />11) Award Recommendation Letter - pdf <br />12) Notice to Proceed - pdf <br />13) Project ledger and signed Statements of Progress - pdf <br />14) Construction material approvals - pdf <br />15) Measurement and payment records - pdf <br />16) Final signed change orders – pdf <br />17) Final Record drawings - pdf <br />18) Signed and stamped drawings for the white goods loading area - pdf <br />
The URL can be used to link to this page
Your browser does not support the video tag.