My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0818 Kittitas County 2022 On Call Amendment 9 SCJ Alliance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-0818 Kittitas County 2022 On Call Amendment 9 SCJ Alliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:44 PM
Creation date
8/27/2026 12:05:13 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Amendment #9 with SCJ for the Cle Elum Transfer Tank Replacement Project
Order
22
Placement
Consent Agenda
Row ID
148367
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Exhibit A <br />Scope of Work <br />Amendment 9 <br />Phase 9 Cle Elum Transfer Tank Replacement <br />Kittitas County, WA <br />Prepared For: Kittitas County <br />Prepared By: Dan Ireland, PE <br />Date Prepared: August 12, 2026 <br />Introduction: <br />SCJ has prepared this amendment to the 2022 On-Call contract for the existing work task: Phase 9 Cle Elum <br />Transfer Station Tank Replacement. <br />This amendment supplements the following tasks with additional services requested or have exceeded the <br />assumed or estimated durations beyond the existing scope of work and fee estimate. <br />We estimate the construction to be completed by end of August 2026 and project closeout process to be <br />completed by October 31, 2026. <br />Phase 9 Cle Elum Transfer Station Tank <br />♦ Task 1 – Preliminary Design <br />♦ Task 4 – Final Construction Package <br />Task 1 Preliminary Design <br />Description of Previous Work Completed and Compensated: The original scope of work assumed the project <br />would be out to bid by September 2025. During the preliminary design phase, the duration of tasks <br />exceeded the estimate based on tank vendors' response times to identify the correct type of tank for the <br />project. This resulted in project management and additional time being required, reaching out to multiple <br />vendors and requesting follow-ups that exceeded what was estimated. An additional 3 months of <br />coordination/managing the preliminary design phase of the project, and 8 hours of coordination were <br />required, compared to what was previously estimated. <br />Task 4 Final Construction Package <br />This amendment updates this task budget to incorporate the Cle Elum Transfer Station Driveway Project <br />that was added to this project near the end of the project. This budget description explains the <br />1) Final Plans: After the review meeting by the County, SCJ will update the construction plans for <br />finalization and bid advertisement.
The URL can be used to link to this page
Your browser does not support the video tag.