My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-08-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-08-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:10:17 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />STAFF REPORT <br />STUDY SESSION DATE: August 11, 2026 <br />ACTION REQUESTED: Informational discussion regarding removal of the material <br />stockpile at the new transfer station. <br />BACKGROUND: Construction of the new transfer station generated <br />approximately 30,000 cubic yards of excavated material that is <br />currently stockpiled onsite. The material was retained for <br />potential beneficial use, including future cover needs at the <br />Ryegrass facility. Due to the volume of material involved, <br />moving the stockpile will require substantial equipment, <br />transportation, and placement work. <br />DISCUSSION: The stockpile will need to be removed as part of the County's <br />long-term management of the new transfer station site. The <br />preliminary cost of removal is approximately $700,000. This <br />estimate reflects the volume of material and the anticipated costs <br />of loading, hauling, and placing it at an appropriate location. <br />Staff is raising the issue now so the anticipated expense is <br />considered as part of future operational and capital planning. <br />FISCAL IMPACT: The preliminary cost of removing the stockpile is approximately <br />$700,000. Actual costs will depend on the final destination, <br />transportation distance, equipment requirements, and the extent <br />to which the material can be beneficially reused. <br />RECOMMENDATION: Discuss the anticipated removal of the material stockpile and <br />associated cost. No formal action is requested. <br />ATTACHMENTS: None <br />LEAD STAFF: Jesse Cox, Solid Waste Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.