My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-08-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-08-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:10:17 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� MW "jFA I <br />BO"Crvitetture <br />PROJECT: New Regional Search and RescuelEOC Facility <br />Kittitas County <br />2021 Airport Rd <br />Cie Elum, WA 98922 <br />TO: Belsaas & Smith Construction inc. INITIATION DATE: <br />PO Box 926 <br />Ellensburg, WA 98926 ARCHITECT'S PROJECT NO.: <br />CONTRACT FOR: <br />Notice to Proceed Date: <br />Substantial Completion Date <br />The following work has been completed and incorporated as changes in this Contract <br />COP-07 <br />Secondary Conductors from Meter to Building <br />COP-09 <br />Credit for Sewer Cleanout Revisions <br />COP-10 <br />Culvert at Airport Road <br />COP-11 <br />Pressure Tank & switch for Well <br />COP-12 <br />Widen drive north of building/generator <br />COP-13 <br />Additional tree removal <br />July 30, 2026 <br />2516 <br />General Construction <br />November 3, 2025 <br />July 31, 2026 <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />Theoriginal Contract Sum was................................................................................................................ <br />Net change by previously authorized Change Orders......................................................................... <br />The Contract Sum will be (increased) by this Change Order.................................................................. <br />The new Contract Sum including this Change Order will be............................................................... <br />Net change in Contract Time by previously authorized Change Orders ................... <br />The Contract Time will be changed per this Change Order <br />The Date of Substantial Completion is now............................................................... <br />B'Mmkit a"re, vllc <br />Kittitas County <br />ARCHITECT <br />OWNER <br />1320 North 16th Avenue, Suite C <br />Yakima, Washington 98902 <br />205 West 5th Ave f <br />Ellensburg, WA 98926 <br />By --7— <br />gy f <br />Date 07/30/2026 <br />Date / rf <br />CHANGE ORDER NO.: 3 <br />reviser <br />Amount Days <br />$35,454.24 65 <br />($1,096.00) 0 <br />$4,563.43 2 <br />$8,999.90 2 <br />$5,802.90 0 <br />$2,045.85 0 <br />TOTAL $55,770.32 69 <br />$2,955,300.00 <br />$93,062.40 <br />$55,770.32 <br />$3,104,132.72 <br />5 <br />69 <br />October 13, 2026 <br />Authorized: <br />Belsaas & Smith Construction inc. <br />CONTRACTOR <br />PO Box 926 <br />Ellensburg, A 98 6 <br />By <br />Date '2/ )3 li�v <br />
The URL can be used to link to this page
Your browser does not support the video tag.