Laserfiche WebLink
6/4/2026 2:13:03 PM Titan Electrical LLC Page 1 <br />Lower valley transfer station, (kittitas) : PCO 034- Grinder Wiring <br />Totals (Summary) - Bid Summary: Mill Motor (XHHW CU Option) <br />Material <br />Non -Quoted <br />$22,964.73 <br />Quotes <br />0.00 <br />Sales Tax (0.00%) <br />0.00 <br />Total Material <br />$22,964.73 <br />Labor <br />Direct (213.09 hours @ $115.00) <br />$24,505.35 <br />Non -Productive Labor <br />0.00 <br />Total Labor (213.09 hours) <br />$24,505.35 <br />Direct Job Expenses <br />$0.00 <br />Tools and Miscellaneous Materials <br />0.00 <br />Subcontracts <br />0.00 <br />Job Subtotal (Prime Cost) <br />$47,470.08 <br />Overhead (10.00%) <br />4,747.01 <br />Profit (10.00%) <br />4,747.01 <br />Job Total <br />$56,964.10 <br />Actual Bid Price $56,964.10 <br />Material to Direct Labor ratio: 0.48 <br />Prime Cost per square foot <br />$0.00 <br />Job Total per square foot <br />$0.00 <br />Actual Bid Price per square ft <br />$0.00 <br />Labor cost per square foot <br />$0.00 <br />Labor hours per square foot <br />0.00 <br />Gross Profit % <br />16.87 <br />Gross Profit $ <br />$9,494.02 <br />Net Profit % <br />8.33 <br />