My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-08-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-08-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:10:17 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1r <br />TITAN <br />ELEC "rR L- <br />10 <br />1 <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Ian Toms <br />Subcontractor Titan Electrical LLC <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />6/8/2026 <br />Change # <br />34 <br />Amount: <br />$56,964.10 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />CHANGE TITLE I Grinder Installation (Option B-XHHW CU) <br />THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: <br />Mill Motor Wiring <br />■ Option B. Provide XHHW CU wire alternative <br />Clarifications <br />■ Steel frame required for cabinet mounting to be fabricated and installed by others. Dimensions <br />to be determined priorto installation <br />■ Setting and securing cabinet by others. Coordination with Titan will be required for feeder wire <br />routing <br />■ Deviations from this scope and means/methods, commissioning of equipment, and alterations <br />requested byAHJ are not included <br />Cost Breakdown This Change: <br />Labor <br />$24,505.35 <br />Material <br />$22,964.73 <br />Other <br />O&P <br />$9,494.02 <br />Total <br />$56,964.10 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.