Laserfiche WebLink
Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br />August 4, 2026 <br />Belsaas and Smith Construction <br />103 East 4th Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 15 <br />Mr. Nelson, <br />I am writing to formally acknowledge and award change order number 15 for the following Change <br />Order Proposals (COP): <br />COP #74 Grinder Electrical $157,353.46 <br />COP #75 Grinder Shed $33,680.55 <br />COP #76 MRW North Wind Wall $70,477.93 <br />Change Order No. 15 Total $261,511.94 <br />Base Bid and Additive A2 <br />$18,441,939.80 <br />Additive Al <br />$642,000.00 <br />Change Order No. 2 <br /><$11,754.08> <br />Change Order No. 3 <br /><$28,041.41> <br />Change Order No. 4 <br />$145,224.93 <br />Change Order No. 5 <br />$233,662.44 <br />Change Order No. 6 <br /><$24,051.84> <br />Change Order No. 7 <br />$96,439.74 <br />Change Order No. 8 <br />$104,401.24 <br />Change Order No. 9 <br />$127,737.00 <br />Change Order No. 10 <br />$46,392.94 <br />Change Order No. 11 <br />$49,209.69 <br />Change Order No. 12 <br />$142,300.43 <br />Change Order No. 13 <br />$68,044.01 <br />Change Order No. 14 <br />$123,878.51 <br />Change Order No. 15 <br />$261,511.94 <br />Subtotal $20,482,742.67 <br />WSST $1.756 024.93 <br />Total $22,238,767.60 <br />Please consider this letter as our formal acceptance of the change order. <br />