Laserfiche WebLink
Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br />June 5, 2026 <br />Belsaas and Smith Construction <br />103 East 411 Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 14 <br />Mr. Nelson, <br />I am writing to formally acknowledge and award change order number 14 for the following Change <br />Order Proposals (COP): <br />COP #29 Plinths MRW <br />$14,172.52 <br />COP #34A Plinths Transfer Station <br />$30,226.26 <br />COP #64 Electrical outlets <br />$2,064.64 <br />COP #66 VFD Cabling <br />$2,614.39 <br />COP #67 Grinder Piers <br />$4,869.08 <br />COP #68 Service Rd <br />$20,455.59 <br />COP #69 Install Sign post for Fee schedule <br />$1,683.50 <br />COP #70 Revised Conduit <br />$30,370.29 <br />COP #71 Gas Detector in MRW <br />$11,414.51 <br />COP #72 MRW Fire Pump Block heater circuit <br />$6,007.73 <br />Change Order No. 14 Total $123,878.51 <br />Base Bid and Additive A2 <br />$18,441,939.80 <br />Additive Al <br />$642,000.00 <br />Change <br />Order No. 2 <br /><$11,754.08> <br />Change <br />Order No. 3 <br /><$28,041.41> <br />Change <br />Order No. 4 <br />$145,224.93 <br />Change <br />Order No. 5 <br />$233,662.44 <br />Change <br />Order No. 6 <br /><$24,051.84> <br />Change <br />Order No. 7 <br />$96,439.74 <br />Change <br />Order No. 8 <br />$104,401.24 <br />Change <br />Order No. 9 <br />$127,737.00 <br />Change <br />Order No. 10 <br />$46,392.94 <br />Change <br />Order No. 11 <br />$49,209.69 <br />Change <br />Order No. 12 <br />$142,300.43 <br />Change <br />Order No. 13 <br />$68,044.01 <br />Change <br />Order No. 14 <br />$123,878.51 <br />